85 B: location and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
85 B
Power plant · Wind
Key facts
Power plant · Windran 42% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 93,216 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Kern County, California
- Operated by
- Wind Wall 1 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 318,053 |
| Capacity factor, 2025 | 0.422 |
| Net generation (MWh), 2025 | 93,216 |
| Balancing authority code | CISO |
Wind turbines
- Turbines
- 13
- Turbine capacity (MW)
- 44.9
- Turbine models
- 13 Vestas V126-3.45
- Hub height (m)
- 87
- Rotor diameter (m)
- 126
- Year online
- 2021
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 21.2 MW
- Generators retired
- 1
- Capacity still in service
- 25.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| WTGN | Onshore Wind Turbine | 21.2 MW | Retired | November 2019 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 66 kV
- Transmission or distribution system owner
- Southern California Edison Co
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 25 km (8)
Connection points within 25 km (4)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- In service · EIA-860M
- Stated Unit WTGN scheduled to retire, 21.2 MW · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- U.S. Wind Turbine Database (USWTDB) — USGS, American Clean Power Association and LBNL; one row per turbineMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 5.5 km | 24.5 |
| Tehachapi Wind Resource I Postponed | Wind | 7.0 km | 0.6 |
| Windhub Solar B, LLC Under construction | Solar | 11.5 km | 26.4 |
| Tehachapi Spindle Withdrawn | Storage | 14.0 km | 20 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 17.0 km | 80 |
| Camino Solar Hybrid Postponed | Storage | 21.6 km | 11 |
| Aratina Solar Center 2 Under construction | Solar + storage | 22.7 km | 200 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 23.2 km | 1,400 |
Sources
- CAISO Public Queue ReportSource: California ISO
- EIA-860M Preliminary Monthly Electric Generator Inventory