85 A — Power plant · Wind · Wind Wall 1 LLC85 B — Power plant · Wind · Wind Wall 1 LLC4001 and 2510 ClearVista Solar and Wind — Withdrawn · Wind · CA · 24.5 MW · 3.4 mi awayTehachapi Wind Resource I — Postponed · Wind · CA · 0.6 MW · 4.3 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 6.5 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 8.1 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 10.0 mi awayCamino Solar Hybrid — Postponed · Storage · CA · 11 MW · 13.3 mi awayAratina Solar Center 2 — Under construction · Solar + storage · CA · 200 MW · 13.6 mi awaySanborn Hybrid 3 — Under construction · Solar + storage · CA · 1,400 MW · 13.8 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Wind Wall 1 LLC

Follow this company

Independent power producer

Key facts

Independent power producer · 46.5 MW
Assets
2
States
CA
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Gross output of plants with a stake

2 of 2 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 2 of 2 plants with a stake: US plants with an EIA monthly series.100% of the output is from 2 plants recorded as wholly owned.2 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2025
  • Wind
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearWindTotal (MWh)
2025163,769163,769
2024168,790168,790
2023149,854149,854
2022156,973156,973
2021 (part year)124,501124,501
202000
201928,37528,375
201834,59034,590
201732,87632,876
201636,61336,613
201530,64330,643
201439,17539,175
201344,60844,608
201234,40034,400
201145,36845,368
201050,08150,081
200947,14047,140
200850,52150,521
200739,60839,608
200625,00725,007
200539,53439,534
200447,07047,070
200348,83548,835
200255,62555,625
200146,88346,883

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 2

Assets

2

Capacity

46.5 MW

MW by fuel
  1. Wind: 46.5 MW, 2 assets

Operates 2 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
85 B Wind Operates 25.2 MW US-CA Wind Wall 1 LLC
85 A Wind Operates 21.3 MW US-CA Wind Wall 1 LLC

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

Around this company

Nearby 8

within 15 mi

Projects

8

within 15 mi

Nearest

3.4 mi

4001 and 2510 ClearVista Solar and Wind

All 8NearbyShowing all 8 nearby projects.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Withdrawn 4001 and 2510 ClearVista Solar and Wind Wind 24.5 MW 3.4 mi away nearest: 85 B
Postponed Tehachapi Wind Resource I Wind 0.6 MW 4.3 mi away nearest: 85 B
Under construction Windhub Solar B, LLC Solar 26.4 MW 6.5 mi away nearest: 85 A
Withdrawn Tehachapi Spindle Storage 20 MW 8.1 mi away nearest: 85 A
Permitted Syracuse and Tours Renewable Energy Solar + storage 80 MW 10.0 mi away nearest: 85 A
Postponed Camino Solar Hybrid Storage 11 MW 13.3 mi away nearest: 85 A
Under construction Aratina Solar Center 2 Solar + storage 200 MW 13.6 mi away nearest: 85 A
Under construction Sanborn Hybrid 3 Solar + storage 1,400 MW 13.8 mi away nearest: 85 A

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution