Chicopee Electric — Power plant · Biomass · Gas Recovery Systems IncPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 1.9 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 1.9 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 3.7 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 4.1 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 4.5 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 6.1 mi awayBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 12.0 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Chicopee Electric

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1993
Net generation, 2009
0 MWh
Grid
14 kV to Massachusetts Electric Co (ISNE)
Location
Hampden County, Massachusetts
Operated by
Gas Recovery Systems IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2012
Fuel burned MMBtu by year, 2001 to 2012
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
33 years since 1993
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2012
Capacity retired
2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Landfill Gas1 MWRetiredJanuary 2012
2Landfill Gas1 MWRetiredJanuary 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Massachusetts Electric Co
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2 scheduled to retire, 2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Palmer Renewable Energy Postponed Biomass 1.9 mi 42
Stony Brook Postponed Gas, combined cycle 1.9 mi 422
Riverside Holyoke Postponed Hydro 3.7 mi 1.1
Chicopee BESS Under construction Storage 4.1 mi 5
Hadley Falls Postponed Hydro 4.5 mi 3.5
Holyoke MA BESS 1 Under construction Storage 6.1 mi 5
Belchertown Solar PV + Battery Project Under construction Solar + storage 12.0 mi 5.6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026