High Bridge
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 53% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2008
- Net generation, 2025
- 2,978,159 MWh
- Grid
- 115 kV to Northern States Power Co - Minnesota (MISO)
- Location
- Ramsey County, Minnesota
- Operated by
- Northern States Power Co - Minnesota
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- Xcel Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 18 years since 2008
- Unused energy
- 2,663 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,145 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 21,280,026 |
| Capacity factor, 2025 | 0.528 |
| Heat rate (Btu/kWh), 2025 | 7,145.4 |
| Net generation (MWh), 2025 | 2,978,159 |
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 276.8 MW
- Generators retired
- 2
- Capacity still in service
- 644 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 5 | Conventional Steam Coal | 113.6 MW | Retired | December 2007 |
| 6 | Conventional Steam Coal | 163.2 MW | Retired | December 2007 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Northern States Power Co - Minnesota
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Northern States Power Co - Minnesota | Operator | EIA-860M | ||
| Xcel Energy | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
- Stated Units 5, 6 scheduled to retire, 276.8 MW · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| DATABANK - EAGAN - MSP2 Built | Large load | 10.7 km | |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 10.8 km | |
| FAIRVIEW DATA CENTER Built | Large load | 11.3 km | |
| EAGAN 5 MW DATA CENTER Built | Large load | 11.5 km | |
| Dakota Solar Postponed | Solar | 13.4 km | 3 |
| HB FULLER CO - DATA CENTER - ARDEN HILLS Built | Large load | 14.0 km | |
| SUPERCOMPUTER LLC Built | Large load | 14.9 km | |
| Black Dog Postponed | Gas, combined cycle | 17.3 km | 760 |
| TC Solar RCE Postponed | Solar | 20.5 km | 1 |
| JIMNIST LLC Built | Large load | 22.4 km | |
| FIS GLOBAL Built | Large load | 23.0 km | |
| Gladiolus Solar, LLC Postponed | Solar | 24.2 km | 1 |