Marshall (NC) — Power plant · Gas, steam turbine · Duke Energy Carolinas, LLCAustin Solar — Postponed · Solar · NC · 2 MW · 15.2 km awayMaiden Creek Battery — Under construction · Storage · NC · 50 MW · 20.1 km awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 22.7 km awayRJ Solar — Postponed · Solar · NC · 5 MW · 22.9 km awayMICROSOFT CORPORATION, CLT10 — Built · Large load · NC · 24.0 km awayHornet Solar — Under construction · Solar · NC · 73 MW · 24.1 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Marshall (NC)

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 37% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2025
6,943,515 MWh
Grid
230 kV to Duke Energy Carolinas, LLC (DUK)
Location
Catawba County, North Carolina

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
61 years since 1965
Heat rate
9,828 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Duke Energy Corp
Share pct
100
Gem entity id
E100000001194
Unit ids
G100000106696, G100000106697, G100000106698, G100000106699
Location id
L100000104082
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160892
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000834
Fuel burned (MMBtu), 202568,239,971
Capacity factor, 20250.374
Heat rate (Btu/kWh), 20259,827.9
Net generation (MWh), 20256,943,515.0
Balancing authority codeDUK

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2028
Last scheduled retirement
December 2033
Capacity scheduled to retire
2,119 MW
Generators scheduled to retire
4
Share of in-service capacity scheduled
100%
Capacity still in service
2,119 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine348.5 MWScheduled to retireDecember 2028
2Conventional Steam Coal348.5 MWScheduled to retireDecember 2028
3Natural Gas Steam Turbine711 MWScheduled to retireDecember 2033
4Conventional Steam Coal711 MWScheduled to retireDecember 2033
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine1,059.5 MW
Conventional Steam Coal1,059.5 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Carolinas, LLC Operator EIA-860M
Duke Energy Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 3, 4 scheduled to retire, 1,422 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 697 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Austin Solar Postponed Solar 15.2 km 2
Maiden Creek Battery Under construction Storage 20.1 km 50
McDowell Creek Solar LLC Under construction Solar 22.7 km 2
RJ Solar Postponed Solar 22.9 km 5
MICROSOFT CORPORATION, CLT10 Built Large load 24.0 km
Hornet Solar Under construction Solar 24.1 km 73