Mount Tom — Power plant · Coal · Pinetree Power- Tamworth LLC.Hadley Falls — Hydro · MA · 3.5 MW · 7.6 km awayRiverside Holyoke — Hydro · MA · 1.1 MW · 8.9 km awayChicopee BESS — Storage · MA · 5 MW · 11.9 km awayStony Brook — Gas, combined cycle · MA · 422 MW · 12.1 km awayHolyoke MA BESS 1 — Storage · MA · 5 MW · 13.1 km awayPalmer Renewable Energy — Biomass · MA · 42 MW · 15.5 km awayBelchertown Solar PV + Battery Project — Solar + storage · MA · 5.6 MW · 19.5 km away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 0% of 2014 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1960
Net generation, 2014
5,236 MWh
Location
Hampden County, Massachusetts

Output

Net generation MWh by year, 2001 to 2014
Fuel burned MMBtu by year, 2001 to 2014
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
66 years since 1960
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
ENGIE SA
Share pct
100
Gem entity id
E100000000382
Unit ids
G100000107060
Location id
L100000103970
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000581086
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000659
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2014
Capacity retired
136 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal136 MWRetiredJune 2014

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ISNE
Transmission lines within 25 km (9)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Pinetree Power- Tamworth LLC. Operator EIA-860M
GDF SUEZ ENERGY NORTH AMERICA INC Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 1 scheduled to retire, 136 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Hadley Falls Postponed Hydro 7.6 km 3.5
Riverside Holyoke Postponed Hydro 8.9 km 1.1
Chicopee BESS Under construction Storage 11.9 km 5
Stony Brook Postponed Gas, combined cycle 12.1 km 422
Holyoke MA BESS 1 Under construction Storage 13.1 km 5
Palmer Renewable Energy Postponed Biomass 15.5 km 42
Belchertown Solar PV + Battery Project Under construction Solar + storage 19.5 km 5.6