Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Seaway: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Seaway
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-OK, US-TX
- Operated by
- Enterprise Products Partners LPSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 506
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | ENTERPRISE PRODUCTS PARTNERS |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Seaway |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| SMT DC Houston III (Hockley data centre) Filed | Large load | 0.2 km | |
| Tex-Bar ESS Contracted | Storage | 0.7 km | 201.5 |
| Bell Creek BESS LLC Contracted | Storage | 0.9 km | 200.9 |
| Mount Whitney BESS Under construction | Storage | 0.9 km | 11 |
| Hollow Branch Creek × 2 units Filed | Solar | 0.9 km | 920 |
| Wensowitch Solar Park Permitted | Solar | 1.6 km | 146.1 |
| Main Horn Solar Studied | Solar | 1.9 km | 100.4 |
| Castor Under construction | Storage | 3.0 km | 200 |
| SOSA Energy Center Under construction | Storage | 3.5 km | 154.6 |
| SERVERFARM - HOCKLEY 2 Under construction | Large load | 3.7 km | |
| Elio Energy LLC Contracted | Storage | 3.7 km | 205.3 |
| Sandman Solar Postponed | Storage | 4.2 km | 100 |
| Freeport Energy Center Postponed | Gas, combined cycle | 4.3 km | 180 |
| Second Division Solar Studied | Storage | 4.4 km | 30 |
| Rock Rose Energy Storage Under construction | Storage | 4.9 km | 208.5 |
| Hockley Under construction | Storage | 5.2 km | 9.9 |
| Brazos River BESS LLC Contracted | Storage | 5.4 km | 180.4 |
| Elm Flats Solar Under construction | Solar + storage | 5.6 km | 375.8 |
| Bluebonnet Prairie Wind Under construction | Wind | 5.8 km | 180 |
| ROYSE CITY DATA CENTER Under construction | Large load | 6.7 km | |
| Valley (TX) Postponed | Coal | 6.9 km | 800 |
| Blue Jay Solar I, LLC Under construction | Solar | 7.2 km | 210 |
| Mallard Energy Storage Under construction | Storage | 7.5 km | 250 |
| Whistle Solar Studied | Solar | 8.3 km | 56.3 |
| Tehuacana Creek Solar Under construction | Solar + storage | 8.5 km | 923.4 |
| Hollow Branch Creek 1 Solar Postponed | Solar | 8.7 km | 460 |
| Avant Prairie ESS Studied | Storage | 8.7 km | 201.7 |
| Ratcliff Solar Park Permitted | Solar | 10.5 km | 85.7 |
| Piedra Solar Under construction | Solar + storage | 10.8 km | 385.4 |
| Orchard BESS Under construction | Storage | 10.9 km | 10 |
| Kaufman Solar Under construction | Solar | 11.2 km | 200 |
| Van Alstyne Energy Center Postponed | Gas, combustion turbine | 11.6 km | 549 |
| Nash Solar Under construction | Solar | 12.1 km | 10 |
| Kahla Storage Studied | Storage | 12.8 km | 200.9 |
| Oak Valley Solar Studied | Solar | 13.1 km | 251.3 |
| Armadillo Solar Center Under construction | Solar | 13.3 km | 150.5 |
| Wittig Solar Park Permitted | Solar | 13.6 km | 106.9 |
| Mystic Springs Renewable Energy (Hybrid) Contracted | Solar + storage | 13.7 km | 508.8 |
| Timber Cove Solar Studied | Solar | 13.8 km | 100.5 |
| Itsee Solar Postponed | Solar | 13.9 km | 53.3 |
| Ables Springs Solar & Storage Under construction | Solar | 14.2 km | 151 |
| Pecan BESS Studied | Storage | 14.4 km | 157.1 |
| Boxcar Energy Storage Under construction | Storage | 14.5 km | 150 |
| Pecan Prairie South Solar Under construction | Solar | 14.8 km | 133 |
| Amerada Studied | Solar + storage | 16.9 km | 452.4 |
| West Moore Solar Postponed | Solar | 17.3 km | 5 |
| Pecan Prairie North Solar Under construction | Solar | 17.5 km | 324.1 |
| Jack Fusco Energy Center Postponed | Gas, combined cycle | 17.8 km | 400 |
| Crowned Heron 2 - Storage, LLC Built | Storage | 18.6 km | 154.2 |
Sources FAA OE/AAA · ERCOT · EIA-860M · EPA ICIS-NPDES