- Wind & solar
- Storage
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Operating
- Other companies nearby
26 assets
26 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 3 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, cancelled, frozen or not stated). Each is in its tab below.
5 outside this view, drawn where they are: zoom out to see them.
Citizens Enterprises
Independent power producer
Key facts
Independent power producer · 132.7 MW- Capacity held
- 132.7MW
- Assets
- 26
- Projects
- 3
- States
- CA, GA, MA, MD, NC, NY and more
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why
Gross output of plants with a stake
4 of 4 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 4 of 4 plants with a stake: US plants with an EIA monthly series.100% of the output is from 4 plants recorded as wholly owned.4 plants: operator, wholly owned per EIA-860.Not included: 22 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Solar
- Storage
Yearly totals
| Year | Solar | Storage | Total (MWh) |
|---|---|---|---|
| 2025 | 43,392 | -693 | 42,699 |
| 2024 | 47,589 | -683 | 46,906 |
| 2023 | 47,517 | — | 47,517 |
| 2022 | 37,062 | — | 37,062 |
| 2021 | 35,876 | — | 35,876 |
| 2020 | 35,675 | — | 35,675 |
| 2019 | 23,647 | — | 23,647 |
| 2018 | 7,386 | — | 7,386 |
| 2017 | 6,944 | — | 6,944 |
| 2016 (part year) | 0 | — | 0 |
Sources EIA-860 · EIA-860M · EIA
Sources
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
Projects 3
Capacity
0.30 GW
none active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Withdrawn | Citizens Enterprises | Wind | 113 MW | SD | Online 30 Sep 2012 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Withdrawn | Citizens Enterprises | Wind | 100 MW | SD | Online 15 Nov 2015 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Withdrawn | Citizens Enterprises | Wind | 90 MW | SD | Online 15 Nov 2015 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
Assets 26
Assets
26
Capacity
133 MW
- Solar: 126 MW, 25 assets
- Storage: 6.2 MW, 1 asset
Operates 26 power plants
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 3
Registers
3
Reuse terms
- 1 Open license
- 2 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
Around this company
Nearby 51
within 25 kmProjects
51
within 25 km
Nearest
0.6 km
Palmer Renewable Energy
All 51NearbyShowing all 51 nearby projects. The 50 nearest are listed.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Palmer Renewable Energy | Biomass | 42 MW | 0.6 km away | nearest: Chicopee River Solar |
| Postponed | Riverside Holyoke | Hydro | 1.1 MW | 1.9 km away | nearest: Chicopee Solar |
| Under construction | Chicopee BESS | Storage | 5 MW | 2.2 km away | nearest: Chicopee Granby Road Solar |
| Postponed | Hadley Falls | Hydro | 3.5 MW | 3.4 km away | nearest: Chicopee Solar |
| Under construction | Holyoke MA BESS 1 | Storage | 5 MW | 4.5 km away | nearest: Chicopee Granby Road Solar |
| Postponed | Stony Brook | Gas, combined cycle | 422 MW | 5.6 km away | nearest: Oak Street Solar |
| Under construction | Sturbridge Road Solar | Solar | 5 MW | 5.6 km away | nearest: Spencer Solar MA |
| Unknown | EQUINIX | Large load | — | 8.0 km away | nearest: PNY BESS LLC |
| Built | CROSS CONNECT SOLUTIONS | Large load | — | 8.0 km away | nearest: PNY BESS LLC |
| Postponed | Perquimans Solar LLC | Solar | 5 MW | 8.2 km away | nearest: Two Mile Desert Project |
| Built | 365 DATA CENTERS | Large load | — | 8.3 km away | nearest: PNY BESS LLC |
| Built | H5 DATA CENTERS | Large load | — | 8.3 km away | nearest: PNY BESS LLC |
| Built | WESTBOROUGH DATA CENTER | Large load | — | 9.0 km away | nearest: Ashland Solar |
| Under construction | Framingham BESS | Storage | 5 MW | 9.4 km away | nearest: Ashland Solar |
| Under construction | Watson 2 | Solar | 4.9 MW | 9.7 km away | nearest: Chenango Solar |
| Under construction | Watson 1 | Solar | 4.8 MW | 9.7 km away | nearest: Chenango Solar |
| Postponed | Deptford Solar One | Solar | 3 MW | 10.8 km away | nearest: PNY BESS LLC |
| Postponed | Hudson Ranch Power II LLC | Geothermal | 55 MW | 11.5 km away | nearest: Citizens Imperial Solar |
| Built | MARKLEY LOWELL | Large load | — | 12.4 km away | nearest: Tyngsborough Solar |
| Postponed | Southbridge Landfill Gas-to-Energy | Biomass | 1.6 MW | 13.5 km away | nearest: Spencer Solar MA |
| Built | AMAZON COM SERVICES LLC DTB9 | Large load | — | 13.9 km away | nearest: Hunt Road Solar |
| Announced | CT Airport Authority Solar One | Solar | 4 MW | 13.9 km away | nearest: Route 57 Solar |
| Under construction | Windsor Locks | Solar | 1.8 MW | 14.7 km away | nearest: Route 57 Solar |
| Under construction | Tanglewood Solar, LLC | Solar | 8.4 MW | 14.7 km away | nearest: Two Mile Desert Project |
| Under construction | Tanglewood BESS | Storage | 3.9 MW | 15.4 km away | nearest: Two Mile Desert Project |
| Announced | Endicott | Solar | 5 MW | 15.4 km away | nearest: Chenango Solar |
| Under construction | Ipswich MA BESS 1 | Storage | 5 MW | 15.9 km away | nearest: Hunt Road Solar |
| Under construction | Town of Sharon Portfolio -Mt St Landfill | Solar + storage | 10.7 MW | 15.9 km away | nearest: Norton Landfill Solar |
| Postponed | Diamond Solar (NY) | Solar | 60 MW | 16.3 km away | nearest: Barneveld Solar |
| Postponed | Dollar Tree Solar One | Solar | 2 MW | 17.0 km away | nearest: Route 57 Solar |
| Postponed | Black Rock I | Geothermal | 70 MW | 17.2 km away | nearest: Citizens Imperial Solar |
| Postponed | Black Rock II | Geothermal | 70 MW | 17.2 km away | nearest: Citizens Imperial Solar |
| Postponed | Black Rock III | Geothermal | 70 MW | 17.2 km away | nearest: Citizens Imperial Solar |
| Built | GRAFTON DATA CENTER | Large load | — | 17.5 km away | nearest: Ashland Solar |
| Filed | Broadleaf Solar | Solar | 200 MW | 17.9 km away | nearest: Route 57 Solar |
| Postponed | Peanut Farm | Solar | 1.8 MW | 19.0 km away | nearest: Two Mile Desert Project |
| Postponed | Canal | Gas, combustion turbine | 330 MW | 19.0 km away | nearest: Falmouth 2 Solar |
| Under construction | Belchertown Solar PV + Battery Project | Solar + storage | 5.6 MW | 19.8 km away | nearest: Oak Street Solar |
| Filed | Salt Cod BESS | Storage | 168 MW | 19.9 km away | nearest: Rehoboth Solar |
| Built | ROBERT HOOKE HOLDINGS, LLC | Large load | — | 20.4 km away | nearest: Tyngsborough Solar |
| Postponed | Martha's Vineyard Community Battery | Storage | 4.9 MW | 20.5 km away | nearest: Falmouth Landfill Solar |
| Postponed | Klees Mill CSG | Solar | 2.8 MW | 21.1 km away | nearest: Union Bridge Solar |
| Filed | Putnam Meadow Solar Station | Solar | 4 MW | 21.1 km away | nearest: Oxford Solar |
| Under construction | Randall Lane Solar | Solar + storage | 10 MW | 21.2 km away | nearest: Falmouth Landfill Solar |
| Under construction | Taft BESS | Storage | 200 MW | 21.4 km away | nearest: Oxford Solar |
| Postponed | BlueWave Capital-Mattapoisett (SREC II) | Solar | 4.5 MW | 21.5 km away | nearest: Falmouth Landfill Solar |
| Postponed | KCE NY 36, LLC | Storage | 20 MW | 22.1 km away | nearest: Barneveld Solar |
| Postponed | Ellington Solar One | Solar | 2 MW | 22.7 km away | nearest: Route 57 Solar |
| Announced | KCE CT 1, LLC | Storage | 45 MW | 23.0 km away | nearest: Oxford Solar |
| Permitted | SunEast Watkins Road Solar Project | Solar | 20 MW | 23.3 km away | nearest: Barneveld Solar |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES