Fall Creek — Power plant · Hydro · PacifiCorpBlundell — Power plant · Geothermal · PacifiCorpHayden — Power plant · Coal · Public Service Co of ColoradoGrace — Power plant · Hydro · PacifiCorpAshton — Power plant · Hydro · PacifiCorpSoda — Power plant · Hydro · PacifiCorpOneida — Power plant · Hydro · PacifiCorpLast Chance — Power plant · Hydro · PacifiCorpEagle Point — Power plant · Hydro · PacifiCorpFish Creek — Power plant · Hydro · PacifiCorpEast Side — Power plant · Hydro · PacifiCorpClearwater 1 — Power plant · Hydro · PacifiCorpClearwater 2 — Power plant · Hydro · PacifiCorpProspect 1 — Power plant · Hydro · PacifiCorpLemolo 1 — Power plant · Hydro · PacifiCorpProspect 3 — Power plant · Hydro · PacifiCorpWallowa Falls — Power plant · Hydro · PacifiCorpToketee Falls — Power plant · Hydro · PacifiCorpProspect 2 — Power plant · Hydro · PacifiCorpProspect 4 — Power plant · Hydro · PacifiCorpSlide Creek — Power plant · Hydro · PacifiCorpSoda Springs — Power plant · Hydro · PacifiCorpGadsby — Power plant · Gas, steam turbine · PacifiCorpCutler Hydro — Power plant · Hydro · PacifiCorpGranite — Power plant · Hydro · PacifiCorpWeber — Power plant · Hydro · PacifiCorpPioneer — Power plant · Hydro · PacifiCorpStairs — Power plant · Hydro · PacifiCorpMerwin — Power plant · Hydro · PacifiCorpYale — Power plant · Hydro · PacifiCorpSwift 1 — Power plant · Hydro · PacifiCorpNaughton — Power plant · Coal · PacifiCorpDave Johnston — Power plant · Coal · PacifiCorpCraig (CO) — Power plant · Coal · Tri-State G & T Assn, IncColstrip — Power plant · Coal · Talen Montana LLCWyodak — Power plant · Coal · PacifiCorpHunter — Power plant · Coal · PacifiCorpSwift 2 — Power plant · Hydro · PacifiCorpLemolo 2 — Power plant · Hydro · PacifiCorpBig Fork — Power plant · Hydro · PacifiCorpBend — Power plant · Hydro · PacifiCorpJim Bridger — Power plant · Gas, steam turbine · PacifiCorpHuntington — Power plant · Coal · PacifiCorpHermiston Generating Plant — Power plant · Gas, combined cycle · Hermiston Generating Co LPChehalis Generating Facility — Power plant · Gas, combined cycle · PacifiCorpCurrant Creek — Power plant · Gas, combined cycle · PacifiCorpLake Side Power Plant — Power plant · Gas, combined cycle · PacifiCorpLeaning Juniper — Power plant · Wind · PacifiCorpMarengo Wind Plant — Power plant · Wind · PacifiCorpGoodnoe Hills — Power plant · Wind · PacifiCorpSeven Mile Hill — Power plant · Wind · PacifiCorpGlenrock — Power plant · Wind · PacifiCorpRolling Hills — Power plant · Wind · PacifiCorpHigh Plains — Power plant · Wind · PacifiCorpMcFadden Ridge — Power plant · Wind · PacifiCorpDunlap — Power plant · Wind · PacifiCorpBlack Cap Solar Plant — Power plant · Solar · PacifiCorpPryor Mountain Wind — Power plant · Wind · PacifiCorpTB Flats — Power plant · Wind · PacifiCorpEkola Flats — Power plant · Wind · PacifiCorpCedar Springs II — Power plant · Wind · PacifiCorpRock Creek Wind — Power plant · Wind · PacifiCorpFoote Creek Rim — Power plant · Wind · PacifiCorpCholla — Power plant · Coal · Arizona Public Service CoIron Gate — Power plant · Hydro · PacifiCorpCopco 1 — Power plant · Hydro · PacifiCorpJohn C Boyle — Power plant · Hydro · PacifiCorpFoote Creek I — Power plant · Wind · PacifiCorpFoote Creek IV — Power plant · Wind · PacifiCorpFoote Creek II — Power plant · Wind · PacifiCorpFoote Creek III — Power plant · Wind · PacifiCorpCopco 2 — Power plant · Hydro · PacifiCorpOlmstead — Power plant · Hydro · PacifiCorpCarbon — Power plant · Coal · PacifiCorpLittle Mountain — Power plant · Gas, combustion turbine · PacifiCorpCondit — Power plant · Hydro · PacifiCorpCline Falls — Power plant · Hydro · PacifiCorpPowerdale — Power plant · Hydro · PacifiCorpCove — Power plant · Hydro · PacifiCorpOIT BESS — Under construction · Under construction · Storage · OR · 2 MWBlundell — Postponed · Geothermal · UT · 30 MW · 0.0 mi awayPerennial Wind Chaser Station — Postponed · Gas, combustion turbine · OR · 424 MW · 0.2 mi awayKlamath Solar — Postponed · Solar · OR · 5 MW · 0.7 mi awayMorel Energy Storage — Permitted · Storage · CO · 200 MW · 0.8 mi awayMedicine Bow Fuel & Power LLC — Postponed · Coal · WY · 350 MW · 1.7 mi awayDATA CENTER (200 S 200 E SLC) — Built · Large load · UT · 2.3 mi awayOIT BESS — Under construction · Storage · OR · 2 MW · 2.4 mi awayBlue Marmot V — Postponed · Solar · OR · 10 MW · 2.5 mi awayHornshadow Solar, LLC — Postponed · Storage · UT · 25 MW · 2.8 mi awayHornshadow Solar II, LLC — Postponed · Storage · UT · 50 MW · 2.8 mi awaySimpson Ridge Wind Farm LLC — Postponed · Wind · WY · 50 MW · 2.8 mi awayDutchman Solar generation and BESS — Filed · Solar + storage · WY · 998 MW · 3.1 mi awayKlamath — Postponed · Gas, combined cycle · OR · 583.9 MW · 3.6 mi awayCape Generating Station — Under construction · Geothermal · UT · 43 MW · 3.7 mi awayCape Generating Station — Under construction · Geothermal · UT · 86 MW · 3.7 mi awayMud Springs Wind Project, LLC — Postponed · Wind · MT · 80 MW · 3.8 mi awayData Center 3 — Filed · Large load · UT · 4.1 mi awayKemmerer Unit 1 — Contracted · Nuclear · WY · 500 MW · 4.1 mi awayBlue Marmot VII — Postponed · Solar · OR · 10 MW · 4.3 mi awayHorse Thief Wind Project, LLC — Postponed · Wind · MT · 80 MW · 4.7 mi awayData Center 1 — Filed · Large load · UT · 4.8 mi awayTwo Rivers Wind Facility — Filed · Wind · WY · 6.1 MW · 4.8 mi awayPDX 245 Campus-Water Tank/Auxiliary Buidling — Filed · Large load · OR · 4.9 mi awayAMAZON DATA SERVICES, INC. — Built · Large load · OR · 5.0 mi awayGRANITE FORTRESS LLC - JUAB DATA CENTER — Under construction · Large load · UT · 5.4 mi awayBlue Marmot IX — Postponed · Solar · OR · 10 MW · 6.7 mi awayCONDUENT DATA CENTER — Large load · UT · 6.8 mi awayOregon Trail Solar — Under construction · Solar · OR · 41 MW · 6.9 mi awayALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 7.0 mi awayBlue Marmot VI — Postponed · Solar · OR · 10 MW · 7.8 mi awayShutler Energy Storage — Under construction · Storage · OR · 41 MW · 7.9 mi awayRodatherm Milford 1 — Under construction · Geothermal · UT · 1.8 MW · 8.9 mi awayMedicine Bow — Postponed · Wind · WY · 1.4 MW · 9.0 mi awayMilford Solar Phase II — Under construction · Solar · UT · 310 MW · 9.0 mi awayLower Snake Solar Generation BESS — Filed · Solar + storage · WA · 600 MW · 9.1 mi awaySABEY UMATILLA DATA CENTER — Under construction · Large load · OR · 9.7 mi awayBlue Marmot VIII — Postponed · Solar · OR · 10 MW · 10.0 mi awayRoosevelt Biogas 1 — Postponed · Biomass · WA · 2.1 MW · 10.5 mi awayMilford Wind Corridor Phase III — Postponed · Wind · UT · 100 MW · 10.6 mi awaySnowflake A Solar and BESS — Filed · Solar + storage · AZ · 950 MW · 10.9 mi awayLund Hill — Postponed · Wind · WA · 60 MW · 10.9 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 10.9 mi awayCentralia Battery Energy Storage System — Filed · Storage · WA · 200 MW · 11.0 mi awayTono Solar — Postponed · Solar · WA · 80 MW · 11.2 mi awayUTAH DATA CENTER — Built · Large load · UT · 11.6 mi awayJoes Valley Dam — Postponed · Hydro · UT · 3.4 MW · 11.9 mi awayBoswell Wind II — Postponed · Wind · WY · 80 MW · 12.9 mi awayBiglow Solar Generation and BESS — Filed · Solar + storage · OR · 250 MW · 13.1 mi awayBluebird Solar — Permitted · Solar · WA · 140 MW · 13.1 mi awayProject Sequoia- Data Center — Filed · Large load · UT · 13.7 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • Retired
  • Other companies nearby
  • 10 · 100 · 1,000 MW

PacifiCorp

Follow this company

Utility

Key facts

Utility · 17,717.3 MW
Capacity held
17,717.3MW
Assets
62
Projects
144
States
CA, CO, ID, MT, OR, UT and more
Headquarters
Portland, United States Source: Wikidata
LEI
SGY07Y7FNYBNLM6Z1M11 Source: Wikidata
Parent
Berkshire Hathaway Energy CompanyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.

Gross output of plants with a stake

68 of 68 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 68 of 68 plants with a stake: US plants with an EIA monthly series.19% of the output is from 61 plants recorded as wholly owned.60 plants: operator, wholly owned per EIA-860.Not included: 11 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Gas
  • Coal
  • Hydro
  • Geothermal
  • Wind
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasCoalHydroGeothermalWindSolarTotal (MWh)
2026 (part year)6,755,95212,745,972323,807—3,135,828—22,961,559
202510,594,66524,543,5942,569,829271,2097,585,2063,33645,567,839
202411,152,44923,000,4522,586,743272,4576,539,5643,87343,555,538
202311,309,61525,130,5612,995,116248,2016,499,3813,81346,186,687
202213,134,07332,620,8552,937,224262,1297,235,9463,93456,194,161
202113,165,84732,659,3432,791,987211,2266,115,2913,23254,946,926
202012,802,50129,814,9803,035,907175,5703,856,6763,55349,689,187
201914,117,61937,218,3372,831,946115,1792,328,1043,28956,614,474
201813,460,37436,484,0593,257,560223,0513,136,2164,11356,565,373
201713,410,91838,655,7184,721,821249,0332,781,3363,96659,822,792
201613,642,03236,745,2963,842,190256,9183,161,7594,02157,652,216
201515,826,58443,458,9792,903,581259,7032,721,3514,46965,174,667
201416,330,93644,519,6673,773,072274,9963,131,3494,30768,034,327
201317,392,57742,777,3853,154,383250,7223,207,5354,69966,787,301
201215,911,07942,529,6984,241,441268,5423,121,96658566,073,311
201115,081,08842,779,2684,538,259278,0803,395,799—66,072,494
201018,022,69247,950,0243,717,910274,3582,644,896—72,609,880
200918,286,33145,198,1163,507,182279,1212,193,083—69,463,833
200818,917,25749,976,8173,740,286254,2771,299,735—74,188,372
200718,537,28350,108,3383,714,728163,925699,620—73,223,894
200618,123,17448,070,4654,563,599190,608331,094—71,278,940
200518,325,10750,006,4713,222,710184,802263,836—72,002,926
200418,457,44632,886,4743,397,524194,876132,049—55,068,369
200317,022,32347,236,4363,738,249198,465196,000—68,391,473
200217,857,24945,744,0693,542,950184,447276,034—67,604,749
200119,193,14546,712,2782,991,232152,742275,160—69,324,557

Sources EIA-860 · EIA-860M · EIA · EPA GHGRP

Sources

  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 4

Registers

4

Reuse terms

  • 2 Open license
  • 2 Open license, with credit

Latest read

2026-11-04

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Oct 30, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • Berkeley Lab ·

    LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)

    Open license, with credit · retrieved Nov 4, 2026

    Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license

    Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 54

within 15 mi

Projects

54

within 15 mi

Nearest

0.0 mi

Blundell

All 54NearbyShowing all 54 nearby projects. The 50 nearest fill 49 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first: 49 rows for the nearest of 54.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Blundell Geothermal 30 MW 0.0 mi away nearest: Blundell
Postponed Perennial Wind Chaser Station Gas, combustion turbine 424 MW 0.2 mi away nearest: Hermiston Generating Plant
Postponed Klamath Solar Solar 5 MW 0.7 mi away nearest: East Side
Permitted Morel Energy Storage Storage 200 MW 0.8 mi away nearest: Craig (CO)
Postponed Medicine Bow Fuel & Power LLC Coal 350 MW 1.7 mi away nearest: Dunlap
Built DATA CENTER (200 S 200 E SLC) Large load — 2.3 mi away nearest: Gadsby
Under construction OIT BESS Storage 2 MW 2.4 mi away nearest: East Side
Postponed Blue Marmot V Solar 10 MW 2.5 mi away nearest: Black Cap Solar Plant
Postponed Hornshadow Solar, LLC Storage 25 MW 2.8 mi away nearest: Hunter
Postponed Hornshadow Solar II, LLC Storage 50 MW 2.8 mi away nearest: Hunter
Postponed Simpson Ridge Wind Farm LLC Wind 50 MW 2.8 mi away nearest: Seven Mile Hill
Filed Dutchman Solar generation and BESS Solar + storage 998 MW 3.1 mi away nearest: Dave Johnston
Postponed Klamath Gas, combined cycle 583.9 MW 3.6 mi away nearest: East Side
Under construction Cape Generating Station × 2 units Geothermal 129 MW 3.7 mi away nearest: Blundell
Postponed Mud Springs Wind Project, LLC Wind 80 MW 3.8 mi away nearest: Pryor Mountain Wind
Filed Data Center 3 Large load — 4.1 mi away nearest: Currant Creek
Contracted Kemmerer Unit 1 Nuclear 500 MW 4.1 mi away nearest: Naughton
Postponed Blue Marmot VII Solar 10 MW 4.3 mi away nearest: Black Cap Solar Plant
Postponed Horse Thief Wind Project, LLC Wind 80 MW 4.7 mi away nearest: Pryor Mountain Wind
Filed Data Center 1 Large load — 4.8 mi away nearest: Currant Creek
Filed Two Rivers Wind Facility Wind 6.1 MW 4.8 mi away nearest: Dunlap
Filed PDX 245 Campus-Water Tank/Auxiliary Buidling Large load — 4.9 mi away nearest: Hermiston Generating Plant
Built AMAZON DATA SERVICES, INC. Large load — 5.0 mi away nearest: Hermiston Generating Plant
Under construction GRANITE FORTRESS LLC - JUAB DATA CENTER Large load — 5.4 mi away nearest: Currant Creek
Postponed Blue Marmot IX Solar 10 MW 6.7 mi away nearest: Black Cap Solar Plant
Unknown CONDUENT DATA CENTER Large load — 6.8 mi away nearest: Granite
Under construction Oregon Trail Solar Solar 41 MW 6.9 mi away nearest: Leaning Juniper
Built ALIGNED DATA CENTER SLC-4 Large load — 7.0 mi away nearest: Gadsby
Postponed Blue Marmot VI Solar 10 MW 7.8 mi away nearest: Black Cap Solar Plant
Under construction Shutler Energy Storage Storage 41 MW 7.9 mi away nearest: Leaning Juniper
Under construction Rodatherm Milford 1 Geothermal 1.8 MW 8.9 mi away nearest: Blundell
Postponed Medicine Bow Wind 1.4 MW 9.0 mi away nearest: Ekola Flats
Under construction Milford Solar Phase II Solar 310 MW 9.0 mi away nearest: Blundell
Filed Lower Snake Solar Generation BESS Solar + storage 600 MW 9.1 mi away nearest: Marengo Wind Plant
Under construction SABEY UMATILLA DATA CENTER Large load — 9.7 mi away nearest: Hermiston Generating Plant
Postponed Blue Marmot VIII Solar 10 MW 10.0 mi away nearest: Black Cap Solar Plant
Postponed Roosevelt Biogas 1 Biomass 2.1 MW 10.5 mi away nearest: Leaning Juniper
Postponed Milford Wind Corridor Phase III Wind 100 MW 10.6 mi away nearest: Blundell
Filed Snowflake A Solar and BESS Solar + storage 950 MW 10.9 mi away nearest: Cholla
Postponed Lund Hill Wind 60 MW 10.9 mi away nearest: Goodnoe Hills
Postponed Kennecott Power Plant Gas, combined cycle 214.3 MW 10.9 mi away nearest: Gadsby
Filed Centralia Battery Energy Storage System Storage 200 MW 11.0 mi away nearest: Chehalis Generating Facility
Postponed Tono Solar Solar 80 MW 11.2 mi away nearest: Chehalis Generating Facility
Built UTAH DATA CENTER Large load — 11.6 mi away nearest: Lake Side Power Plant
Postponed Joes Valley Dam Hydro 3.4 MW 11.9 mi away nearest: Huntington
Postponed Boswell Wind II Wind 80 MW 12.9 mi away nearest: McFadden Ridge
Filed Biglow Solar Generation and BESS Solar + storage 250 MW 13.1 mi away nearest: Goodnoe Hills
Permitted Bluebird Solar Solar 140 MW 13.1 mi away nearest: Goodnoe Hills
Filed Project Sequoia- Data Center Large load — 13.7 mi away nearest: Granite

Sources EIA-860M · EPA ICIS-NPDES · FAA OE/AAA · Berkeley Lab · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Every source and license · Attribution