Download grid data Lines Substations GeoParquet
Color

Map key

  • Combustion Clean firm Wind & solar Storage Bioenergy Loads Unspecified fuel
  • Planned Building Running
  • Runs a lot → Rarely runs Retired

Dashed: MW not stated. A bar: stage not stated. Sizes from regional zoom.

Combustion: gas, coal, oil. Clean firm: nuclear, hydro. Other: the rest.

Fainter: runs less than US plants of the same technology, last 12 months or latest full year (EIA).

© OpenStreetMap: what is counted, credits, sources, about and legal

What is counted

Planned

Projects announced, filed, studied, permitted or contracted.

Sources load with the counts.
Under construction

Projects under construction.

Sources load with the counts.
Operating

Power plants in service.

Sources load with the counts.
Idling or retired

Plants retiring, on standby, out of service or retired; each row says which. Retired plants need the Status filter when no stage is chosen.

Sources load with the counts.

Basemap: Protomaps, © OpenStreetMap contributors, ODbL · Copyright and license
Fallback outline: Natural Earth · US Census Bureau (public domain)

Projects: ERCOT · CAISO · NYISO · EIA-860M · NESO · Virginia DEQ · EPA ICIS-Air · EPA Class VI · Plants: EIA-860M
Supported by National Energy SO Open Data

Facilities outside the US: Global Energy Monitor, GIPT (CC BY 4.0).

US energy projects and power plants, from first filing to retirement.

Public records, free to use. Every record links to its source.

  1. Project Matador Gas Plant (PMG)—11,679.3MWProject · Gas, combined cycle · Carson, TX · due Dec 2027 · Fermi America
  2. Chokecherry and Sierra Madre Wind—3,550.5MWProject · Wind · Carbon, WY · due Dec 2032 · Power Company of Wyoming LLC
  3. Coastal Virginia Offshore Wind (CVOW) Commercial Project—2,640MWProject · Offshore wind · Virginia · due Jan 2027 · Dominion Energy Inc.
  4. Cumberland (TN)—1,555.6MWProject · Gas, combined cycle · Stewart, TN · due Dec 2034 · Tennessee Valley Authority
  5. Yates—1,448.4MWProject · Gas, combustion turbine · Coweta, GA · due Feb 2027 · Georgia Power Co
  6. Sanborn Hybrid 3—1,400MWProject · Solar + storage · Kern, CA · due Dec 2026 · Terra-Gen Operating Co-Hybrid
  7. Libra Solar—1,400MWProject · Solar + storage · Lyon, NV · due Dec 2027 · Libra Solar LLC
  8. CPV Basin Ranch Energy Center—1,350MWProject · Gas, combined cycle · Ward, TX · due Feb 2029 · CPV Basin Ranch
  9. Orange County Advanced Power Station—1,306MWProject · Gas, combined cycle · Orange, TX · due Oct 2026 · Entergy Texas Inc.
  10. Clear Fork Creek Solar and BESS SLF—1,202MWProject · Solar + storage · Wilson, TX · due Mar 2027 · Clear Fork
  11. J955 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—1,165MWProject · Gas, other · Sangamon, IL · due Jan 2025
  12. Sunrise Wind—924MWProject · Offshore wind · Suffolk, NY · due Oct 2027 · Orsted Wind Power North America LLC
  13. Tehuacana Creek Solar—923.4MWProject · Solar + storage · Navarro, TX · due May 2027 · Parliament Energy Holdings LLC
  14. Horseshoe Lake—896MWProject · Gas, combustion turbine · Oklahoma, OK · due Oct 2026 · Oklahoma Gas & Electric Co
  15. Vast Sands Power—880MWProject · Gas, combustion turbine · Ward, TX · due May 2027 · Permian Power I LLC
  16. Vicksburg Advanced Power Station (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—820MWProject · Gas, other · Warren, MS · due Aug 2028 · Entergy Mississippi LLC
  17. Traceview Advanced Power Station—819.4MWProject · Gas, combined cycle · Madison, MS · due Aug 2028 · Entergy Mississippi LLC
  18. Empire Wind 1—810MWProject · Offshore wind · Kings, NY · due Sep 2027 · Empire Offshore Wind LLC
  19. Steel River Solar Phase 1—750MWProject · Solar + storage · Mississippi, AR · due Aug 2028 · Cypress Creek Renewables
  20. Steel River Solar Phase 2—750MWProject · Solar + storage · Mississippi, AR · due Jul 2029 · Cypress Creek Renewables
  21. Steel River Solar Phase 3—750MWProject · Solar + storage · Mississippi, AR · due Jul 2030 · Cypress Creek Renewables
  22. Mill Creek (KY)—740MWProject · Gas, combined cycle · Jefferson, KY · due Jun 2027 · Louisville Gas & Electric Co
  23. Revolution Wind—715MWProject · Offshore wind · Washington, RI · due Nov 2026 · Orsted Wind Power North America LLC
  24. Rowdy Creek Solar and BESS—701.8MWProject · Solar + storage · Lamar, TX · due Jun 2028 · Parliament Energy Holdings LLC
  25. Cedar Bayou 5—697MWProject · Gas, combustion turbine · Chambers, TX · due Aug 2028 · Cedar Bayou 5 LLC
  26. Pelicans Jaw Hybrid Solar—678.5MWProject · Solar + storage · Kern, CA · due Apr 2027 · Pelicans Jaw Solar LLC
  27. Banita Creek- Spindlepop Solar—673.9MWProject · Solar + storage · Nacogdoches, TX · due Jun 2028 · Parliament Energy Holdings LLC
  28. Easley Solar—650MWProject · Solar + storage · Riverside, CA · due Oct 2026 · IP Easley, LLC
  29. Swan Solar—650MWProject · Solar · Bates, MO · due Sep 2028 · Swan Solar LLC
  30. Shady Hills Combined Cycle Facility—612MWProject · Gas, combined cycle · Pasco, FL · due Nov 2026 · Shady Hills Energy Center, LLC
  31. Singing Grass Wind—603MWProject · Wind · Kit Carson, CO · due Sep 2027 · Public Service Co of Colorado
  32. Swenson Solar—600MWProject · Solar · Stonewall, TX · due Nov 2026 · Swenson Solar LLC
  33. Pioneer Clean Energy Center—600MWProject · Solar + storage · Yuma, AZ · due Apr 2027 · Yuma bn, LLC
  34. Sherco BESS—600MWProject · Storage · Sherburne, MN · due Dec 2027 · Northern States Power Co - Minnesota
  35. Seminole Electric Cooperative, Inc.—575MWProject · Gas, other · Pasco, FL · due Jun 2020 · Seminole Electric Cooperative Inc
  36. J732 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—561.5MWProject · Gas, other · Douglas, WI · due Nov 2023
  37. Hecate Energy Cider Solar LLC—557MWProject · Solar · Genesee, NY · due Dec 2026 · Greenbacker Renewable Energy Corporation
  38. Maricopa Solar—550MWProject · Storage · Maricopa, AZ · due Dec 2026 · Maricopa Solar
  39. Hashknife Energy Center LLC—550MWProject · Solar + storage · Navajo, AZ · due Nov 2026 · Invenergy Services LLC
  40. Country Acres Clean Power LLC—516MWProject · Solar + storage · Placer, CA · due Feb 2027 · Clenera DevCo LLC
  41. Roseland Solar Project, LLC—500MWProject · Solar · Falls, TX · due Oct 2026 · Enel Green Power Roseland Solar, LLC
  42. Bellefield 2 Solar & Energy Storage Farm—500MWProject · Solar + storage · Kern, CA · due Dec 2026 · 26SB 8me LLC
  43. Evlou Solar, LLC—500MWProject · Solar + storage · El Paso, TX · due Jan 2028 · Evlou Solar, LLC
  44. J1060 (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)—500MWProject · Solar · St. Francis, AR · due May 2023
  45. Fort St Vrain—478MWProject · Gas, combustion turbine · Weld, CO · due Dec 2027 · Public Service Co of Colorado
  46. Panther Grove 2—472.5MWProject · Wind · Livingston, IL · due Dec 2027 · Panther Grove 2 LLC
  47. GulfStar Power, LLC—451.6MWProject · Solar · Wharton, TX · due Oct 2026 · GulfStar Power, LLC
  48. Chalk Bluff Solar—450MWProject · Solar · St Francis, AR · due Jun 2027 · Chalk Bluff Solar Energy LLC
  49. Pawnee Solar & BESS—450MWProject · Solar + storage · Morgan, CO · due Dec 2027 · Public Service Co of Colorado
  50. Q269—450MWProject · Storage · Maricopa, AZ · due Dec 2022
Under construction projects in view, sorted by MW, descending
Project Matador Gas Plant (PMG)ProjectUnder construction11,679.3MW—Dec 2027EIA-860M
Chokecherry and Sierra Madre WindProjectUnder construction3,550.5MW—Dec 2032EIA-860M
Coastal Virginia Offshore Wind (CVOW) Commercial ProjectProjectUnder construction2,640MW—Jan 2027EIA-860M
Cumberland (TN)ProjectUnder construction1,555.6MW—Dec 2034EIA-860M
YatesProjectUnder construction1,448.4MW—Feb 2027EIA-860M
Sanborn Hybrid 3ProjectUnder construction1,400MW—Dec 2026EIA-860M
Libra SolarProjectUnder construction1,400MW—Dec 2027EIA-860M
CPV Basin Ranch Energy CenterProjectUnder construction1,350MW—Feb 2029EIA-860M
Orange County Advanced Power StationProjectUnder construction1,306MW—Oct 2026EIA-860M
Clear Fork Creek Solar and BESS SLFProjectUnder construction1,202MW—Mar 2027EIA-860M
J955ProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)1,165MW——Jan 2025Berkeley Lab
Sunrise WindProjectUnder construction924MW—Oct 2027EIA-860M
Tehuacana Creek SolarProjectUnder construction923.4MW—May 2027EIA-860M
Horseshoe LakeProjectUnder construction896MW—Oct 2026EIA-860M
Vast Sands PowerProjectUnder construction880MW—May 2027EIA-860M
Vicksburg Advanced Power StationProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)820MW—Aug 2028EIA-860M
Traceview Advanced Power StationProjectUnder construction819.4MW—Aug 2028EIA-860M
Empire Wind 1ProjectUnder construction810MW—Sep 2027EIA-860M
Steel River Solar Phase 1ProjectUnder construction750MW—Aug 2028EIA-860M
Steel River Solar Phase 2ProjectUnder construction750MW—Jul 2029EIA-860M
Steel River Solar Phase 3ProjectUnder construction750MW—Jul 2030EIA-860M
Mill Creek (KY)ProjectUnder construction740MW—Jun 2027EIA-860M
Revolution WindProjectUnder construction715MW—Nov 2026EIA-860M
Rowdy Creek Solar and BESSProjectUnder construction701.8MW—Jun 2028EIA-860M
Cedar Bayou 5ProjectUnder construction697MW—Aug 2028EIA-860M
Pelicans Jaw Hybrid SolarProjectUnder construction678.5MW—Apr 2027EIA-860M
Banita Creek- Spindlepop SolarProjectUnder construction673.9MW—Jun 2028EIA-860M
Easley SolarProjectUnder construction650MW—Oct 2026EIA-860M
Swan SolarProjectUnder construction650MW—Sep 2028EIA-860M
Shady Hills Combined Cycle FacilityProjectUnder construction612MW—Nov 2026EIA-860M
Singing Grass WindProjectUnder construction603MW—Sep 2027EIA-860M
Swenson SolarProjectUnder construction600MW—Nov 2026EIA-860M
Pioneer Clean Energy CenterProjectUnder construction600MW—Apr 2027EIA-860M
Sherco BESSProjectUnder construction600MW—Dec 2027EIA-860M
Seminole Electric Cooperative, Inc.ProjectUnder construction575MW—Jun 2020Berkeley Lab
J732ProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)561.5MW——Nov 2023Berkeley Lab
Hecate Energy Cider Solar LLCProjectUnder construction557MW—Dec 2026EIA-860M
Maricopa SolarProjectUnder construction550MW—Dec 2026EIA-860M
Hashknife Energy Center LLCProjectUnder construction550MW—Nov 2026EIA-860M
Country Acres Clean Power LLCProjectUnder construction516MW—Feb 2027EIA-860M
Roseland Solar Project, LLCProjectUnder construction500MW—Oct 2026EIA-860M
Bellefield 2 Solar & Energy Storage FarmProjectUnder construction500MW—Dec 2026EIA-860M
Evlou Solar, LLCProjectUnder construction500MW—Jan 2028EIA-860M
J1060ProjectUnder construction (status as of the file: MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0); not current)500MW——May 2023Berkeley Lab
Fort St VrainProjectUnder construction478MW—Dec 2027EIA-860M
Panther Grove 2ProjectUnder construction472.5MW—Dec 2027EIA-860M
GulfStar Power, LLCProjectUnder construction451.6MW—Oct 2026EIA-860M
Chalk Bluff SolarProjectUnder construction450MW—Jun 2027EIA-860M
Pawnee Solar & BESSProjectUnder construction450MW—Dec 2027EIA-860M
Q269ProjectUnder construction450MW——Dec 2022Berkeley Lab

Status not current MISO queue as of Dec 31, 2025, compiled by Berkeley Lab and GridTracker (CC BY 4.0)

Status not current

The status is the one the file states on that date, not the register’s current one.

What is counted

  • Counts follow the map: move it or pick a state.
  • Planned and Construction: every project a register still lists.
  • Withdrawn and canceled: not counted; the Projects list shows them.
  • Operating and Idling or retired: plants, from EIA-860M (US) and GEM’s GIPT.
  • No stage chosen: all stages together, retired plants left out.
  • Built projects are drawn among the plants, never counted twice.
  • Not on this map: projects placed only by county or state, or with the site withheld by license.
  • They are counted, not drawn, once the view holds that whole area.
  • Data center MW is demand, never added to generation.

Status words · Methodology

Generation

Net generation ÷ (MW × hours), last 12 months or latest full year (EIA-923). US plants only.

Under Color: Underused, the least-run plants for their technology are darkest.

Independent: no utility, co-op or public power owner or operator on record (EIA-860). Plants only.

Pipelines and power lines

Gas pipelines and power lines, with gas processing and storage, LNG terminals, ethanol and renewable gas plants.

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Power prices at hubs

Monthly average power price: a point where a hub's location is published, else one chip per market.

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Wholesale price (nodes)

Day-ahead average over 12 months, the median of the pricing nodes placed in each county.

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Industrial price (county)

Average revenue per MWh, not a tariff quote. The median of the utilities serving each county.

Its sources are read when this opens.

Sources and licenses · Reuse conditions

Fiber by county

Availability by county, not routes.

FCC National Broadband Map

Unshaded: not stated.

Sources and licenses · Reuse conditions