- Wind & solar
- In development
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
- Operating
85 A: location and 9 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
85 A
Power plant · Wind
Key facts
Power plant · Windran 38% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2021
- Net generation, 2025
- 70,553 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Kern County, California
- Operated by
- Wind Wall 1 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 240,726 |
| Capacity factor, 2025 | 0.378 |
| Net generation (MWh), 2025 | 70,553 |
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 14.1 MW
- Generators retired
- 1
- Capacity still in service
- 21.3 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| WGNS | Onshore Wind Turbine | 14.1 MW | Retired | December 2019 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 66 kV
- Transmission or distribution system owner
- Southern California Edison Co
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 25 km (8)
Connection points within 25 km (5)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- In service · EIA-860M
- Stated Unit WGNS scheduled to retire, 14.1 MW · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISO Public Queue ReportSource: California ISO
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 6.3 km | 24.5 |
| Tehachapi Wind Resource I Postponed | Wind | 7.1 km | 0.6 |
| Windhub Solar B, LLC Under construction | Solar | 10.4 km | 26.4 |
| Tehachapi Spindle Withdrawn | Storage | 13.1 km | 20 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 16.2 km | 80 |
| Camino Solar Hybrid Postponed | Storage | 21.3 km | 11 |
| Aratina Solar Center 2 Under construction | Solar + storage | 21.9 km | 200 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 22.2 km | 1,400 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 24.9 km | 500 |
Sources
- CAISO Public Queue ReportSource: California ISO
- EIA-860M Preliminary Monthly Electric Generator Inventory