Brookfield Tehachapi 1
Power plant · Wind
Key facts
Power plant · Windran 18% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 164,452 MWh
- Grid
- 60 kV to Southern California Edison Co (CISO)
- Location
- Kern County, California
- Operated by
- Coram California Development, L.P.
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 561,110 |
| Capacity factor, 2025 | 0.184 |
| Net generation (MWh), 2025 | 164,452 |
| Balancing authority code | CISO |
Wind turbines
Wind turbines
USGS maps these turbines around a center 5.0 mi from the point this page maps the plant at; the nearest turbine is 2.5 mi from that point.
- Turbines
- 34
- Turbine capacity (MW)
- 102
- Turbine models
- 34 Vestas V90-3.0
- Hub height (m)
- 80
- Rotor diameter (m)
- 90
- Year online
- 2012
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Coram California Development, L.P. | Operator | EIA-860M | ||
| Brookfield Renewable Energy Group | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Windhub Solar B, LLC Under construction | Solar | 1.6 mi | 26.4 |
| Tehachapi Spindle Withdrawn | Storage | 3.7 mi | 20 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 5.5 mi | 80 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 7.3 mi | 1,400 |
| Willow Rock Energy Storage Center Contracted | Storage | 8.1 mi | 500 |
| Tehachapi Wind Resource I Postponed | Wind | 9.1 mi | 0.6 |
| Aratina Solar Center 2 Under construction | Solar + storage | 9.5 mi | 200 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 9.8 mi | 500 |
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 10.9 mi | 24.5 |
| Camino Solar Hybrid Postponed | Storage | 12.6 mi | 11 |
| Bellefield 3 Solar and Battery Storage Contracted | Solar + storage | 14.2 mi | 150 |