CALNEV: route and 47 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Calnev
Petroleum product pipeline
As filed: CALNEV
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-CA, US-NV
- Operated by
- Kinder Morgan, Inc.SourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 264
- Units
- 2
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 2 |
| Operator, as the source states it | KINDER MORGAN |
| Mapped segments | 2 |
| Source release | 202001 |
| Pipeline name raw | CALNEV |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Baldy Mesa Storage Under construction | Solar + storage | 0.5 km | 100 |
| Solar Photovoltaic Project #27 Postponed | Solar | 3.5 km | 1 |
| Solar Photovoltaic Project #25 Postponed | Solar | 3.6 km | 4.5 |
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 4.0 km | 3 |
| Solar Photovoltaic Project #24 Postponed | Solar | 4.7 km | 4 |
| OES Biogas Power Under construction | Biomass | 4.8 km | 2.6 |
| SWITCH LTD. Built | Large load | 4.8 km | |
| Switch Data Center Building Filed | Large load | 5.1 km | |
| Solar Photovoltaic Project #40 Postponed | Solar | 5.3 km | 10 |
| Solar Photovoltaic Project #41 Postponed | Solar | 5.3 km | 10 |
| Big Creek Solar LLC Under construction | Solar | 5.6 km | 400 |
| Solar Photovoltaic Project #28 Postponed | Solar | 6.4 km | 0.5 |
| Switch NAP 16 Under construction | Large load | 6.5 km | |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 7.3 km | 4 |
| Solar Photovoltaic Project #30 Postponed | Solar | 7.4 km | 1.5 |
| SunE Redlands Postponed | Solar | 8.5 km | 1.5 |
| Minneola Solar Under construction | Solar | 9.7 km | 3 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 12.3 km | 5 |
| Solar Photovoltaic Project #20 Postponed | Solar | 12.4 km | 3.5 |
| Solar Photovoltaic Project #17 Postponed | Solar | 13.2 km | 0.5 |
| Solar Photovoltaic Project #19 Postponed | Solar | 13.6 km | 5 |
| Solar Photovoltaic Project #18 Postponed | Solar | 13.7 km | 0.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 13.8 km | 1.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 14.2 km | 0.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 14.2 km | 0.5 |
| Solar Photovoltaic Project #04 Postponed | Solar | 14.7 km | 1.5 |
| JASMINE DEVELOPMENT, LLC Built | Large load | 15.1 km | |
| Energy Center Announced | Gas, combustion turbine | 15.8 km | 0.9 |
| Solar Photovoltaic Project #21 Postponed | Solar | 17.1 km | 2.5 |
| Solar Photovoltaic Project #31 Postponed | Solar | 17.5 km | 1 |
| Zuni Solar 1 Postponed | Solar | 18.9 km | 1.5 |
| Vitex Storage Filed | Storage | 19.0 km | 300 |
| Zuni Solar 2 Postponed | Solar | 19.0 km | 1.5 |
| Solar Photovoltaic Project #12 Postponed | Solar | 19.6 km | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 19.9 km | 0.5 |
| Solar Photovoltaic Project #09 Postponed | Solar | 20.3 km | 0.5 |
| Roccasecca BESS LLC Under construction | Storage | 21.1 km | 126.6 |
| Boulder Flats Solar Under construction | Solar | 21.5 km | 113 |
| Bellefield 3 Solar and Battery Storage Contracted | Solar + storage | 21.6 km | 150 |
| Roadhouse Energy Center Contracted | Storage | 22.1 km | 300 |
| RCWMD Badlands Landfill Gas Project Postponed | Biomass | 22.8 km | 1.2 |
| Dry Lake East Energy Center Under construction | Solar | 23.3 km | 200 |
| Amazon - Moreno Valley Postponed | Solar | 23.3 km | 2.2 |
| Willow Rock Energy Storage Center Contracted | Storage | 23.5 km | 500 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 23.8 km | 500 |
| Boulder Solar III LLC Announced | Solar + storage | 24.8 km | 256 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 24.8 km | 1,400 |
Sources CAISO · EIA-860M · EPA ICIS-Air · FAA OE/AAA