TPC Windfarms LLC
Power plant · Wind
Key facts
Power plant · Windran 17% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1986
- Net generation, 2025
- 42,113 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Kern County, California
- Operated by
- Terra-Gen Operating Co-Wind
Output
Details
Who’s behind it
- Owner
- TPC Windfarm LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 40 years since 1986
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 143,688 |
| Capacity factor, 2025 | 0.168 |
| Net generation (MWh), 2025 | 42,113 |
| Balancing authority code | CISO |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Terra-Gen Operating Co-Wind | Operator | EIA-860M | ||
| TPC Windfarm LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Windhub Solar B, LLC Under construction | Solar | 2.6 mi | 26.4 |
| Tehachapi Spindle Withdrawn | Storage | 3.5 mi | 20 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 7.4 mi | 80 |
| Tehachapi Wind Resource I Postponed | Wind | 7.5 mi | 0.6 |
| 4001 and 2510 ClearVista Solar and Wind Withdrawn | Wind | 8.6 mi | 24.5 |
| Sanborn Hybrid 3 Under construction | Solar + storage | 8.9 mi | 1,400 |
| Aratina Solar Center 2 Under construction | Solar + storage | 9.6 mi | 200 |
| Bellefield 2 Solar & Energy Storage Farm Under construction | Solar + storage | 10.9 mi | 500 |
| Willow Rock Energy Storage Center Contracted | Storage | 11.0 mi | 500 |
| Camino Solar Hybrid Postponed | Storage | 13.4 mi | 11 |