- Wind & solar
- Operating
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Operating
- Other companies nearby
1 asset
1 asset. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
TPC Windfarm LLC
Power plant owner
Key facts
Power plant owner · 28.7 MW- Capacity held
- 28.7MW
- Assets
- 1
- States
- CA
- Registered in
- United States
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
1 of 1 plantOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 1 of 1 plant with a stake: US plants with an EIA monthly series.100% of the output is from 1 plant recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Wind
Yearly totals
| Year | Wind | Total (MWh) |
|---|---|---|
| 2025 | 42,113 | 42,113 |
| 2024 | 46,488 | 46,488 |
| 2023 | 38,666 | 38,666 |
| 2022 | 47,899 | 47,899 |
| 2021 | 55,819 | 55,819 |
| 2020 | 51,903 | 51,903 |
| 2019 | 52,248 | 52,248 |
| 2018 | 64,439 | 64,439 |
| 2017 | 55,586 | 55,586 |
| 2016 | 58,940 | 58,940 |
| 2015 | 74,716 | 74,716 |
| 2014 | 72,897 | 72,897 |
| 2013 | 55,077 | 55,077 |
| 2012 | 51,864 | 51,864 |
| 2011 | 60,525 | 60,525 |
| 2010 | 59,966 | 59,966 |
| 2009 | 64,367 | 64,367 |
| 2008 | 44,044 | 44,044 |
| 2007 | 70,102 | 70,102 |
| 2006 | 60,912 | 60,912 |
| 2005 | 61,047 | 61,047 |
| 2004 | 74,886 | 74,886 |
| 2003 | 80,233 | 80,233 |
| 2002 | 81,058 | 81,058 |
| 2001 | 74,571 | 74,571 |
Assets 1
Assets
1
Capacity
28.7 MW
- Wind: 28.7 MW, 1 asset
Owns 1 power plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| TPC Windfarms LLC | Wind | Owns | 28.7 MW | US-CA | 100.0% | TPC Windfarm LLC |
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 2
Registers
2
Reuse terms
- 1 Open license
- 1 Open license, with credit
Latest read
2026-10-30
From its recordsSourcesThe registers behind this company's assets, projects and RFPs; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 10
within 15 miProjects
10
within 15 mi
Nearest
2.6 mi
Windhub Solar B, LLC
All 10NearbyShowing all 10 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Windhub Solar B, LLC | Solar | 26.4 MW | 2.6 mi away | nearest: TPC Windfarms LLC |
| Withdrawn | Tehachapi Spindle | Storage | 20 MW | 3.5 mi away | nearest: TPC Windfarms LLC |
| Permitted | Syracuse and Tours Renewable Energy | Solar + storage | 80 MW | 7.4 mi away | nearest: TPC Windfarms LLC |
| Postponed | Tehachapi Wind Resource I | Wind | 0.6 MW | 7.5 mi away | nearest: TPC Windfarms LLC |
| Withdrawn | 4001 and 2510 ClearVista Solar and Wind | Wind | 24.5 MW | 8.6 mi away | nearest: TPC Windfarms LLC |
| Under construction | Sanborn Hybrid 3 | Solar + storage | 1,400 MW | 8.9 mi away | nearest: TPC Windfarms LLC |
| Under construction | Aratina Solar Center 2 | Solar + storage | 200 MW | 9.6 mi away | nearest: TPC Windfarms LLC |
| Under construction | Bellefield 2 Solar & Energy Storage Farm | Solar + storage | 500 MW | 10.9 mi away | nearest: TPC Windfarms LLC |
| Contracted | Willow Rock Energy Storage Center | Storage | 500 MW | 11.0 mi away | nearest: TPC Windfarms LLC |
| Postponed | Camino Solar Hybrid | Storage | 11 MW | 13.4 mi away | nearest: TPC Windfarms LLC |