General Electric Aircraft Engines — Power plant · Solar · General Electric Aircraft EnginesWabtec U.S Rail, Grove City Engine Plant — Power plant · Oil · General Electric CoCaledonia — Power plant · Gas, combined cycle · Tennessee Valley AuthorityShady Hills Generating Station — Power plant · Gas, combustion turbine · Shady Hills Power Co LLCParlin Power Plant — Power plant · Gas, combined cycle · Consolidated Edison Energy, Inc.Inland Empire Energy Center — Power plant · Gas, combined cycle · Inland Empire Energy Ctr LLCCardinal Cogen — Power plant · Gas, combined cycle · Cardinal Cogen IncMeghnaghat-II power station — Power plant · Gas, combined cycleLos Guindos power station — Power plant · Gas, combustion turbine · Los Guindos GeneraciónSu Scioffu solar farm — Power plant · SolarAshalim Megalim solar farm — Power plant · Solar (thermal)ISCC Waad Al Shamal CSP solar farm — Power plant · Solar (thermal) · General ElectricYelisirur wind farm — Power plant · Wind · General ElectricMorjar wind farm — Power plant · WindTenega Generasi wind farm — Power plant · Wind · General ElectricHawa Energy wind farm — Power plant · Wind · General ElectricSapphire wind farm (Pakistan) — Power plant · Wind · General ElectricSapphire-Tricon wind farm — Power plant · Wind · General ElectricJhimpir Power (Burj Capital) wind farm — Power plant · Wind · Harbin Electric; General ElectricMaster Wind Energy wind farm — Power plant · Wind · Hydrochina CORP (PowerChina); General ElectricRudine wind farm — Power plant · Wind · General ElectricBaleni wind farm — Power plant · Wind · General ElectricCordal wind farm — Power plant · Wind · General ElectricMarkbygden wind farm — Power plant · Wind · Enercon; Markbygden Vind; Skogberget VindHaliade-X Massvlakte Prototype Onshore offshore wind farm — Power plant · Wind · General ElectricBirr power station — Power plant · Gas, combustion turbineGENERAL ELECTRIC, ROCKVILLE — Built · Built · Large load · MDGE INFORMATION SYSTEMS — Built · Built · Large load · MDShady Hills Generating Station — Postponed · Gas, combustion turbine · FL · 518 MW · 0.0 mi awayShady Hills Combined Cycle Facility — Under construction · Gas, combined cycle · FL · 612 MW · 0.0 mi awayPasco Cnty Solid Waste Resource Recovery — Under construction · Waste to energy · FL · 17 MW · 0.1 mi awayOrion power station -- — Canceled · Coal · Bangladesh · 700 MW · 0.4 km awayTrestles Grid LLC — Postponed · Battery storage · CA · 150 MW · 0.6 mi awayGateway Energy Center, LLC — Postponed · Gas, combined cycle · NJ · 440 MW · 1.6 mi awayMiddlesex Energy Center LLC — Postponed · Gas, combined cycle · NJ · 570 MW · 1.8 mi awaySino Well wind farm -- — Announced · Wind · Pakistan · 50 MW · 3.6 km awayNew Caledonia — Announced · Gas, combustion turbine · MS · 504 MW · 2.5 mi awayMaasvlakte floating solar farm -- — Announced · Solar · Netherlands · 96 MW · 4.2 km awayChina Sunec wind farm -- — Canceled · Wind · Pakistan · 50 MW · 4.3 km awayMaasvlakte Power Station (Onyx Power) 1, timepoint 2 — Announced · Biomass · Netherlands · 731 MW · 4.6 km awayWestern Energy wind farm -- — Announced · Wind · Pakistan · 50 MW · 4.9 km awayCacho wind farm -- — Announced · Wind · Pakistan · 50 MW · 5.6 km awayEnergizar BESS — Filed · Battery storage · MA · 250 MW · 4.5 mi awayMunshiganj power station Phase I — Canceled · Coal · Bangladesh · 400 MW · 7.8 km awayMunshiganj power station Phase II — Canceled · Coal · Bangladesh · 400 MW · 7.8 km awayMunshiganj power station 1 — Announced · Gas, combined cycle · Bangladesh · 600 MW · 7.8 km awayMunshiganj power station 2 — Canceled · Gas, combined cycle · Bangladesh · 660 MW · 7.8 km awayMunshiganj power station 5 — Canceled · Gas, combined cycle · Bangladesh · 660 MW · 7.8 km awayMunshiganj power station 4 — Canceled · Gas, combined cycle · Bangladesh · 660 MW · 7.8 km awayMunshiganj power station 3 — Canceled · Gas, combined cycle · Bangladesh · 660 MW · 7.8 km awayMunshiganj power station 6 — Canceled · Gas, combined cycle · Bangladesh · 660 MW · 7.8 km awayMonte Águila solar farm -- — Announced · Solar · Chile · 240 MW · 8.7 km awaySidon solar farm -- — Announced · Solar · Chile · 150 MW · 9.0 km awayMilltown Onsite BESS — Under construction · Battery storage · NJ · 13.2 MW · 5.7 mi awayGazaria power station (RPCL) Unit 1 — Canceled · Coal · Bangladesh · 350 MW · 9.9 km awayGazaria power station (RPCL) 1 — Announced · Gas, combined cycle · Bangladesh · 600 MW · 9.9 km awayGazaria power station (RPCL) 2 — Announced · Gas, combined cycle · Bangladesh · 600 MW · 9.9 km awayLas Fresias wind farm -- — Announced · Wind · Chile · 310 MW · 10.4 km awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 7.0 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 7.1 mi awayBeznau nuclear power plant 3 — Canceled · Nuclear · Switzerland · 1,600 MW · 12.8 km away888 Ross Data Center — Filed · Large load · CA · 8.2 mi awayLas Mellizas solar farm -- — Announced · Solar · Chile · 173 MW · 13.4 km awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 8.5 mi awayArabian Sea wind farm -- — Canceled · Wind · Pakistan · 50 MW · 14.6 km awayDañicalqui wind farm -- — Announced · Wind · Chile · 95.2 MW · 15.1 km awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 9.5 mi awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Built · Large load · NJ · 9.5 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 9.8 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 9.9 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 10.0 mi awayWildomar Solar — Postponed · Solar · CA · 1.2 MW · 10.4 mi awayNJ 1 DATA CENTER — Built · Large load · NJ · 10.6 mi awaySu Inziru solar farm -- — Announced · Solar · Italy · 95 MW · 17.9 km awayElevate Arthur Kill — Under construction · Battery storage · NY · 15.1 MW · 11.2 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 11.4 mi awayPrologis - SLCNJ001 - Community Solar — Under construction · Solar · NJ · 3.2 MW · 11.5 mi awayBLOOMBERG DATA CENTER — Built · Large load · NJ · 11.6 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Operating
  • Retired
  • Size not stated
  • Approximate location
  • Other companies nearby
  • 10 · 100 · 1,000 MW

General Electric CO

Show on map

Follow this company

Power plant owner

As filed: GENERAL ELECTRIC CO

Key facts

Power plant ownerNo parent recordedLike 48,146 of 50,299 companies here. Why
States
CA, FL, MA, MS, NJ, PA
Companies below
2
Headquarters
Evendale, United States Source: Wikidata
Listed
NYSE: GE Source: SEC EDGAR
LEI
3C7474T6CDKPR9K6YT90 Source: Wikidata

On the map, by stage

Load demand — GW operating (2 loads)

Gross output of plants with a stake

7 of 14 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 7 of 14 plants with a stake: US plants with an EIA monthly series.100% of the output is from 7 plants recorded as wholly owned.1 plant: operator, wholly owned per EIA-860.Not included: 12 plants it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2001 to 2026
  • Gas
  • Oil
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearGasOilSolarTotal (MWh)
2026 (part year)4,079,7628801,4104,082,052
20255,728,0974,8192,4895,735,405
20245,513,4726,1122,2945,521,878
20234,059,2972,8092,3234,064,429
20225,412,2513,3822,4415,418,074
20214,676,0073,4632,2964,681,766
20204,730,3283,28616,3594,749,973
20194,252,2396,49753,9114,312,647
20184,965,5763,82461,7855,031,185
20175,292,6061,73162,2845,356,621
20166,222,3503,54557,1136,283,008
20154,729,98310,79749,0174,789,797
20146,135,8536,01936,4836,178,355
20136,014,2836,32745,3676,065,977
20129,302,6412870,4819,373,150
20118,130,7142755,3108,186,051
20109,184,1191,98256,1149,242,215
20096,156,67643564,0106,221,121
20084,275,0434,00362,3964,341,443
20073,562,7776,72296,0533,665,552
20061,632,6826,139123,8191,762,639
20051,860,0467,160118,7911,985,996
20042,227,3740131,0592,358,433
20031,609,0178,241120,3371,737,595
20021,089,6348,729145,8821,244,245
2001510,9248,475146,653666,051

Sources GEM · EIA-860 · EIA-860M · EIA · EPA GHGRP

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIA-860Open license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 27, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EPA GHGRPOpen license · retrieved Nov 2, 2026

Attribution

Sources 6

Registers

6

Reuse terms

  • 5 Open license
  • 1 Open license, with credit

Latest read

2026-11-16

From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.

Sources

  • EIA-860M ·

    EIA-860M Preliminary Monthly Electric Generator Inventory

    Open license · retrieved Oct 30, 2026

    US federal work — public domain

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • GEM ·

    Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)

    Open license, with credit · retrieved Oct 26, 2026

    Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license

    In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • EPA ICIS-Air ·

    EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

    Open license · retrieved Nov 16, 2026

    US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)

    View at source →
  • EPA ICIS-Air ·

    EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)

    Open license · retrieved Nov 16, 2026

    US federal work — public domain, 17 U.S.C. §105 (docs/13 §2.12 EPA hedge applies)

    View at source →
  • Wikidata ·

    Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)

    Open license · retrieved Nov 4, 2026

    Source: Wikidata (CC0) · license

    Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."

    Summary only: the source’s license keeps the full record at the source.

    View at source →
  • SEC EDGAR ·

    SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)

    Open license · retrieved Nov 4, 2026

    Source: U.S. Securities and Exchange Commission, EDGAR · license

    SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).

    Summary only: the source’s license keeps the full record at the source.

    View at source →

Around this company

Nearby 76

within 15 mi (25 km outside the US)

Projects

76

within 15 mi (25 km outside the US)

Nearest

0.0 mi

Shady Hills Generating Station

All 76NearbyShowing all 76 nearby projects. The 50 nearest are listed.

How these are matched

Exact-grade projects within 15 mi (25 km outside the US) of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi (25 km outside the US) of this company’s assets, sorted by distance, nearest first: 50 rows for the nearest of 76.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Shady Hills Generating Station Gas, combustion turbine 518 MW 0.0 mi away nearest: Shady Hills Generating Station
Under construction Shady Hills Combined Cycle Facility Gas, combined cycle 612 MW 0.0 mi away nearest: Shady Hills Generating Station
Under construction Pasco Cnty Solid Waste Resource Recovery Waste to energy 17 MW 0.1 mi away nearest: Shady Hills Generating Station
Canceled Orion power station -- Coal 700 MW 0.4 km away nearest: Meghnaghat-II power station
Postponed Trestles Grid LLC Battery storage 150 MW 0.6 mi away nearest: Inland Empire Energy Center
Postponed Gateway Energy Center, LLC Gas, combined cycle 440 MW 1.6 mi away nearest: Parlin Power Plant
Postponed Middlesex Energy Center LLC Gas, combined cycle 570 MW 1.8 mi away nearest: Parlin Power Plant
Announced Sino Well wind farm -- Wind 50 MW 3.6 km away nearest: Jhimpir Power (Burj Capital) wind farm
Announced New Caledonia Gas, combustion turbine 504 MW 2.5 mi away nearest: Caledonia
Announced Maasvlakte floating solar farm -- Solar 96 MW 4.2 km away nearest: Haliade-X Massvlakte Prototype Onshore offshore wind farm
Canceled China Sunec wind farm -- Wind 50 MW 4.3 km away nearest: Sapphire wind farm (Pakistan)
Announced Maasvlakte Power Station (Onyx Power) 1, timepoint 2 Biomass 731 MW 4.6 km away nearest: Haliade-X Massvlakte Prototype Onshore offshore wind farm
Announced Western Energy wind farm -- Wind 50 MW 4.9 km away nearest: Hawa Energy wind farm
Announced Cacho wind farm -- Wind 50 MW 5.6 km away nearest: Sapphire-Tricon wind farm
Filed Energizar BESS Battery storage 250 MW 4.5 mi away nearest: General Electric Aircraft Engines
Canceled Munshiganj power station Phase I Coal 400 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station Phase II Coal 400 MW 7.8 km away nearest: Meghnaghat-II power station
Announced Munshiganj power station 1 Gas, combined cycle 600 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station 2 Gas, combined cycle 660 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station 5 Gas, combined cycle 660 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station 4 Gas, combined cycle 660 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station 3 Gas, combined cycle 660 MW 7.8 km away nearest: Meghnaghat-II power station
Canceled Munshiganj power station 6 Gas, combined cycle 660 MW 7.8 km away nearest: Meghnaghat-II power station
Announced Monte Águila solar farm -- Solar 240 MW 8.7 km away nearest: Los Guindos power station
Announced Sidon solar farm -- Solar 150 MW 9.0 km away nearest: Los Guindos power station
Under construction Milltown Onsite BESS Battery storage 13.2 MW 5.7 mi away nearest: Parlin Power Plant
Canceled Gazaria power station (RPCL) Unit 1 Coal 350 MW 9.9 km away nearest: Meghnaghat-II power station
Announced Gazaria power station (RPCL) 1 Gas, combined cycle 600 MW 9.9 km away nearest: Meghnaghat-II power station
Announced Gazaria power station (RPCL) 2 Gas, combined cycle 600 MW 9.9 km away nearest: Meghnaghat-II power station
Announced Las Fresias wind farm -- Wind 310 MW 10.4 km away nearest: Los Guindos power station
Postponed San Jacinto Solar Solar 1.5 MW 7.0 mi away nearest: Inland Empire Energy Center
Postponed Lake Perris Solar Solar 1.5 MW 7.1 mi away nearest: Inland Empire Energy Center
Canceled Beznau nuclear power plant 3 Nuclear 1,600 MW 12.8 km away nearest: Birr power station
Filed 888 Ross Data Center Large load — 8.2 mi away nearest: Cardinal Cogen
Announced Las Mellizas solar farm -- Solar 173 MW 13.4 km away nearest: Los Guindos power station
Under construction Perris DC 5 - sline015 Solar 1.6 MW 8.5 mi away nearest: Inland Empire Energy Center
Canceled Arabian Sea wind farm -- Wind 50 MW 14.6 km away nearest: Tenega Generasi wind farm
Announced Dañicalqui wind farm -- Wind 95.2 MW 15.1 km away nearest: Los Guindos power station
Built Barclays Capital Data Center Large load — 9.5 mi away nearest: Parlin Power Plant
Built Evoque Data Center Solutions - PNJ1 Large load — 9.5 mi away nearest: Parlin Power Plant
Under construction 7999 Gateway Solar Solar 4.6 MW 9.8 mi away nearest: Cardinal Cogen
Announced Gateway#1&2 (Newark CA) Solar 1.1 MW 9.9 mi away nearest: Cardinal Cogen
Postponed Amazon - Moreno Valley Solar 2.2 MW 10.0 mi away nearest: Inland Empire Energy Center
Postponed Wildomar Solar Solar 1.2 MW 10.4 mi away nearest: Inland Empire Energy Center
Built NJ 1 Data Center Large load — 10.6 mi away nearest: Parlin Power Plant
Announced Su Inziru solar farm -- Solar 95 MW 17.9 km away nearest: Su Scioffu solar farm
Under construction Elevate Arthur Kill Battery storage 15.1 MW 11.2 mi away nearest: Parlin Power Plant
Postponed Waste Management Tri-Cities LFGTE Biomass 4.8 MW 11.4 mi away nearest: Cardinal Cogen
Under construction Prologis - SLCNJ001 - Community Solar Solar 3.2 MW 11.5 mi away nearest: Parlin Power Plant
Built Bloomberg Data Center Large load — 11.6 mi away nearest: Parlin Power Plant

Sources EIA-860M · GEM · FAA OE/AAA · EPA ICIS-Air

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • FAA OE/AAAOpen license · retrieved Nov 23, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026

Every source and license · Attribution