- Combustion
- Bioenergy
- Operating
- Retired
- Other infrastructure
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Bioenergy
- Operating
- Retired
- Other infrastructure
- Other companies nearby
37 assets
37 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Not on this map: 4 projects: placed by county or state, a license that withholds the site, or a stage the map draws no dot for (withdrawn, canceled, frozen or not stated). Each is in its tab below.
Xcel Energy
Power plant owner and Gas processing operator
Key facts
Power plant owner and Gas processing operator · 18,001.5 MW- Capacity held
- 18,001.5MW
- Assets
- 37
- Projects
- 4
- States
- CO, MN, NM, SD, TX, WI
- Companies below
- 3
- Headquarters
- Minneapolis, United States Source: Wikidata
- Website
- xcelenergy.com Source: Wikidata
- Listed
- Nasdaq: XEL Source: SEC EDGAR
- LEI
- LGJNMI9GH8XIDG5RCM61 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
36 of 36 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 36 of 36 plants with a stake: US plants with an EIA monthly series.58% of the output is from 32 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
- Coal
- Oil
- Bioenergy
Yearly totals
| Year | Gas | Coal | Oil | Bioenergy | Total (MWh) |
|---|---|---|---|---|---|
| 2026 (part year) | 16,698,305 | 9,968,151 | 47,349 | 146,639 | 26,860,444 |
| 2025 | 26,652,852 | 21,333,472 | 59,484 | 400,621 | 48,446,429 |
| 2024 | 31,507,540 | 21,149,242 | 61,210 | 389,310 | 53,107,302 |
| 2023 | 29,543,576 | 24,264,104 | 62,171 | 386,499 | 54,256,350 |
| 2022 | 24,683,388 | 29,835,556 | 59,455 | 394,525 | 54,972,924 |
| 2021 | 26,630,744 | 30,925,895 | 62,886 | 414,709 | 58,034,234 |
| 2020 | 31,144,943 | 24,534,708 | 56,660 | 434,112 | 56,170,423 |
| 2019 | 33,224,514 | 34,228,649 | 60,648 | 429,856 | 67,943,667 |
| 2018 | 30,478,703 | 38,414,463 | 53,870 | 388,336 | 69,335,372 |
| 2017 | 25,381,464 | 39,800,617 | 58,533 | 371,092 | 65,611,706 |
| 2016 | 28,623,053 | 39,968,400 | 63,530 | 385,128 | 69,040,111 |
| 2015 | 29,687,995 | 41,212,064 | 63,371 | 404,985 | 71,368,415 |
| 2014 | 27,949,629 | 43,732,932 | 55,151 | 397,537 | 72,135,249 |
| 2013 | 28,321,503 | 40,672,587 | 65,745 | 425,374 | 69,485,209 |
| 2012 | 31,473,873 | 40,737,850 | 69,398 | 399,707 | 72,680,828 |
| 2011 | 29,155,743 | 44,201,544 | 63,628 | 428,798 | 73,849,713 |
| 2010 | 30,288,410 | 44,955,114 | 68,401 | 435,515 | 75,747,440 |
| 2009 | 29,983,641 | 44,532,091 | 63,931 | 485,065 | 75,064,728 |
| 2008 | 35,175,656 | 44,078,857 | 69,206 | 526,939 | 79,850,658 |
| 2007 | 37,418,454 | 43,450,972 | 80,476 | 584,390 | 81,534,292 |
| 2006 | 37,357,433 | 44,400,539 | 90,059 | 509,958 | 82,357,989 |
| 2005 | 37,915,350 | 43,247,069 | 87,874 | 552,821 | 81,803,114 |
| 2004 | 36,673,094 | 45,370,780 | 82,746 | 527,481 | 82,654,101 |
| 2003 | 33,296,080 | 46,896,856 | 75,958 | 531,501 | 80,800,395 |
| 2002 | 33,262,340 | 46,371,330 | 58,000 | 508,258 | 80,199,928 |
| 2001 | 34,956,608 | 45,031,732 | 78,541 | 564,401 | 80,631,282 |
Projects 4
Capacity
1.26 GW
1.26 GW active
| Status | Name. Sort by name, A to Z | Type | MW, sorted descending. Sort by capacity, smallest first | State | Online. Sort by proposed online date, latest first | Source |
|---|---|---|---|---|---|---|
| Studied | Benton Energy Storage II | Solar + storage | 415.8 MW | MN | Online Feb 25, 2028 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Studied | Nobles BESS | Storage | 313.9 MW | MN | Online Apr 8, 2028 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Studied | Sherco South BESS | Storage | 313.9 MW | MN | Online Jul 29, 2027 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
| Studied | Sandhill Energy Storage | Storage | 213.5 MW | MN | Online Sep 30, 2025 | LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions) |
Sources Berkeley Lab
Assets 37
Assets
37
2 kinds
Capacity
18,002 MW
36 of 37 give MW
- Coal: 6,900 MW, 8 assets
- Gas, combined cycle: 4,633 MW, 6 assets
- Gas, steam turbine: 3,534 MW, 8 assets
- Gas, combustion turbine: 2,652 MW, 10 assets
- Oil: 188 MW, 1 asset
- Other: 95.2 MW, 3 assets
Operates 1 gas processing plant · Owns 36 power plants · Owns 1 gas processing plant
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| Sherburne County | Coal | Owns | 1,704 MW | US-MN | 84.4% | Xcel Energy |
| Craig (CO) | Coal | Owns | 1,427.6 MW | US-CO | 6.5% | Xcel Energy |
| Comanche (CO) | Coal | Owns | 1,252.8 MW | US-CO | 82.5% | Xcel Energy |
| Fort St Vrain | Gas, combined cycle | Owns | 1,148.5 MW | US-CO | 100.0% | Xcel Energy |
| Tolk | Coal | Owns | 1,135.8 MW | US-TX | 100.0% | Xcel Energy |
| Harrington | Gas, steam turbine | Owns | 1,080 MW | US-TX | 100.0% | Xcel Energy |
| Cherokee | Gas, combined cycle | Owns | 1,006.4 MW | US-CO | 100.0% | Xcel Energy |
| Jones | Gas, steam turbine | Owns | 860.4 MW | US-TX | 100.0% | Xcel Energy |
| Rocky Mountain Energy Center | Gas, combined cycle | Owns | 685.1 MW | US-CO | 100.0% | Xcel Energy |
| High Bridge | Gas, combined cycle | Owns | 644 MW | US-MN | 100.0% | Xcel Energy |
| Allen S King | Coal | Owns | 598.4 MW | US-MN | 100.0% | Xcel Energy |
| Riverside (MN) | Gas, combined cycle | Owns | 585.9 MW | US-MN | 100.0% | Xcel Energy |
| Black Dog | Gas, combined cycle | Owns | 562.8 MW | US-MN | 100.0% | Xcel Energy |
| Pawnee | Gas, steam turbine | Owns | 552.3 MW | US-CO | 100.0% | Xcel Energy |
| Nichols | Gas, steam turbine | Owns | 474.7 MW | US-TX | 100.0% | Xcel Energy |
| Hayden | Coal | Owns | 465.4 MW | US-CO | 53.0% | Xcel Energy |
| Cunningham | Gas, combustion turbine | Owns | 444.2 MW | US-NM | 100.0% | Xcel Energy |
| Angus Anson | Gas, combustion turbine | Owns | 405.7 MW | US-SD | 100.0% | Xcel Energy |
| Blue Spruce Energy Center | Gas, combustion turbine | Owns | 397.8 MW | US-CO | 100.0% | Xcel Energy |
| Blue Lake | Gas, combustion turbine | Owns | 362 MW | US-MN | 100.0% | Xcel Energy |
| Manchief Electric Generating Station | Gas, combustion turbine | Owns | 300 MW | US-CO | 100.0% | Xcel Energy |
| Wheaton | Gas, combustion turbine | Owns | 298.1 MW | US-WI | 100.0% | Xcel Energy |
| Inver Hills | Gas, combustion turbine | Owns | 284.4 MW | US-MN | 100.0% | Xcel Energy |
| Arapahoe | Coal | Owns | 240.5 MW | US-CO | 100.0% | Xcel Energy |
| Maddox | Gas, steam turbine | Owns | 212 MW | US-NM | 100.0% | Xcel Energy |
| Plant X | Gas, steam turbine | Owns | 190.4 MW | US-TX | 100.0% | Xcel Energy |
| French Island | Oil | Owns | 188 MW | US-WI | 100.0% | Xcel Energy |
| Zuni | Gas, steam turbine | Owns | 115.2 MW | US-CO | 100.0% | Xcel Energy |
| Cameo | Coal | Owns | 75 MW | US-CO | 100.0% | Xcel Energy |
| Key City | Gas, combustion turbine | Owns | 72 MW | US-MN | 100.0% | Xcel Energy |
| Valmont | Gas, combustion turbine | Owns | 59.3 MW | US-CO | 100.0% | Xcel Energy |
| Moore County | Gas, steam turbine | Owns | 49 MW | US-TX | 100.0% | Xcel Energy |
| Bay Front | Biomass | Owns | 47.2 MW | US-WI | 100.0% | Xcel Energy |
| Riverview | Gas, combustion turbine | Owns | 28.6 MW | US-TX | 100.0% | Xcel Energy |
| Wilmarth | Waste to energy | Owns | 25 MW | US-MN | 100.0% | Xcel Energy |
| Red Wing | Waste to energy | Owns | 23 MW | US-MN | 100.0% | Xcel Energy |
| Rifle Gas Plant-Rifle Creek | Gas processing plant | Operates and owns | — | US-CO | — | Xcel Energy |
Sources EIA Energy Atlas · EIA-860M · GEM
Sources
- EIA Energy Atlas
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Ownership 4
Companies
4
this one included
Parents
0
Subsidiaries
3
direct
Assets are what each company holds itself. A dash: this view does not show it; the company’s own page does.
-
Xcel Energy This company 93 assets26,353.2 MWwith the companies below
-
Northern States Power Co - Minnesota Subsidiary · share not stated 53 assets11,103.6 MW
-
Public Service Co of Colorado Subsidiary · share not stated 27 assets9,567.1 MW
-
Southwestern Public Service Co Subsidiary · share not stated 12 assets5,682.5 MW
-
The same companies as a table, with each ownership claim
| Company. Sort by company, A to Z | Relationship, sorted ascending. Sort by relationship, subsidiaries first | Assets. Sort by assets held, largest first | Asset types |
|---|---|---|---|
| Xcel Energy | This company | 37 | gas processing plant, power plant |
| Northern States Power Co - Minnesota | Subsidiary | — | — |
| Public Service Co of Colorado | Subsidiary | — | — |
| Southwestern Public Service Co | Subsidiary | — | — |
Sources 6
Registers
6
Reuse terms
- 4 Open license
- 2 Open license, with credit
Latest read
2026-11-13
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA Energy Atlas ·
EIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)
US federal work — public domain; EIA reuse statement quoted in docs/13 section 2.11. Dataset-level licenseInfo on the Atlas item not retrieved by script (JS app); read it in a browser before the layer ships, same task as us.eia.atlas.gas_pipelines
Summary only: the source’s license keeps the full record at the source.
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Berkeley Lab ·
LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)
Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. · license
Publication page https://eta-publications.lbl.gov/publications/queued-2026-edition-characteristics, retrieved 2026-10-23 (HTTP 200) — "Copyright Notice: The Queued Up data file is licensed CC BY 4.0. You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." and "Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker. CC BY 4.0. All rights reserved." The file's Introduction sheet adds the DOE contract notice ("This dataset has been authored by an author at Lawrence Berkeley National Laboratory under Contract No. DE-AC02-05CH11231 with the U.S. Department of Energy ...") and the standard no-warranty disclaimer
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
-
View at source →
SEC EDGAR ·
SEC EDGAR company tickers with exchange (company_tickers_exchange.json — CIK, EDGAR conformed name, ticker, exchange)
Source: U.S. Securities and Exchange Commission, EDGAR · license
SEC website, "Privacy and Information Security" (https://www.sec.gov/about/privacy-information, read 2026-10-22), Website Dissemination: "Information presented on sec.gov is considered public information and may be copied or further distributed by users of the web site without the SEC’s permission. Please consider appropriate citation to the SEC as the source." SEC "Accessing EDGAR Data" (https://www.sec.gov/search-filings/edgar-search-assistance/accessing-edgar-data, read 2026-10-22): "Current max request rate: 10 requests/second."; "Please declare your user agent in request headers: Sample Declared Bot Request Headers: User-Agent: Sample Company Name AdminContact@<sample company domain>.com"; on this file: "We periodically update these files to provide functionality for EDGAR searches, but do not guarantee accuracy or scope." A compilation by a federal agency (17 U.S.C. §105).
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 80
within 15 miProjects
80
within 15 mi
Nearest
0.0 mi
Fort St Vrain
All 80NearbyShowing all 80 nearby projects. The 50 nearest are listed.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Under construction | Fort St Vrain | Gas, combustion turbine | 478 MW | 0.0 mi away | nearest: Fort St Vrain |
| Postponed | Black Dog | Gas, combined cycle | 760 MW | 0.0 mi away | nearest: Black Dog |
| Under construction | Blue Lake BESS | Storage | 135.5 MW | 0.2 mi away | nearest: Blue Lake |
| Permitted | Sherco LDES | Storage | 10 MW | 0.4 mi away | nearest: Sherburne County |
| Under construction | Sherco BESS | Storage | 600 MW | 0.7 mi away | nearest: Sherburne County |
| Under construction | Pivot Solar 43 LLC | Solar | 3.5 MW | 0.8 mi away | nearest: Blue Spruce Energy Center |
| Under construction | Pivot Solar 53 LLC | Solar | 4 MW | 0.8 mi away | nearest: Blue Spruce Energy Center |
| Permitted | Morel Energy Storage | Storage | 200 MW | 0.8 mi away | nearest: Craig (CO) |
| Built | CORESITE - DE1 | Large load | — | 1.3 mi away | nearest: Zuni |
| Built | CORESITE REAL ESTATE DE3 - CORESITE DE3 | Large load | — | 1.5 mi away | nearest: Cherokee |
| Filed | DEN1-DC2 (Aurora data centre) | Large load | — | 1.9 mi away | nearest: Blue Spruce Energy Center |
| Under construction | South Platte Solar | Solar | 150 MW | 2.0 mi away | nearest: Manchief Electric Generating Station |
| Under construction | AC Ranch I | Solar | 75 MW | 2.0 mi away | nearest: Maddox |
| Filed | AC Ranch II | Solar | 230 MW | 2.0 mi away | nearest: Maddox |
| Built | IRON MOUNTAIN DATA CENTERS - FORTRUST | Large load | — | 2.0 mi away | nearest: Cherokee |
| Built | SUPERCOMPUTER LLC | Large load | — | 2.0 mi away | nearest: Riverside (MN) |
| Built | QTS AURORA LLC - QTS DEN1 | Large load | — | 2.1 mi away | nearest: Blue Spruce Energy Center |
| Permitted | MN CSG 2019-57 | Solar | 1 MW | 2.2 mi away | nearest: Wilmarth |
| Built | INTELISHIFT US LLC - DENVER DATA CENTER | Large load | — | 2.2 mi away | nearest: Arapahoe |
| Built | JPMORGAN CHASE - PROJECT SYCAMORE AURORA | Large load | — | 2.3 mi away | nearest: Blue Spruce Energy Center |
| Built | LOCKHEED MARTIN - DENVER DATA CENTER | Large load | — | 2.7 mi away | nearest: Cherokee |
| Postponed | Elk Mound | Gas, combustion turbine | 71 MW | 2.8 mi away | nearest: Wheaton |
| Postponed | Dakota Solar | Solar | 3 MW | 3.0 mi away | nearest: Inver Hills |
| Built | FAIRVIEW DATA CENTER | Large load | — | 3.0 mi away | nearest: Riverside (MN) |
| Built | JIMNIST LLC | Large load | — | 3.3 mi away | nearest: Inver Hills |
| Postponed | Vestas Towers America, Inc. | Wind | 3 MW | 3.5 mi away | nearest: Comanche (CO) |
| Under construction | Pivot Solar 71 LLC | Solar | 1.8 MW | 3.5 mi away | nearest: Pawnee |
| Under construction | Arroyo Solar | Solar | 335 MW | 3.5 mi away | nearest: Comanche (CO) |
| Under construction | EESolar22 | Solar | 2.6 MW | 4.1 mi away | nearest: Wilmarth |
| Postponed | Gladiolus Solar, LLC | Solar | 1 MW | 4.1 mi away | nearest: Inver Hills |
| Built | APA060 - Phase 5 MDC (Aurora data centre) | Large load | — | 4.4 mi away | nearest: Blue Spruce Energy Center |
| Permitted | Stagecoach LRE | Solar | 230 MW | 4.5 mi away | nearest: Comanche (CO) |
| Built | IRON GATE DATA CENTERS - EAGAN | Large load | — | 4.6 mi away | nearest: Black Dog |
| Built | EAGAN 5 MW DATA CENTER | Large load | — | 4.6 mi away | nearest: Inver Hills |
| Permitted | Cunningham Solar II | Solar | 196 MW | 5.1 mi away | nearest: Cunningham |
| Postponed | TC Solar RCE | Solar | 1 MW | 5.4 mi away | nearest: Riverside (MN) |
| Built | SAMARITANS PURSE DATA CENTER | Large load | — | 5.4 mi away | nearest: Blue Spruce Energy Center |
| Built | AMAZON DATA SERVICES - DEN-22 | Large load | — | 5.5 mi away | nearest: Blue Spruce Energy Center |
| Built | DATABANK - EAGAN - MSP2 | Large load | — | 5.5 mi away | nearest: Black Dog |
| Under construction | Waxwing Solar CSG | Solar | 3 MW | 6.2 mi away | nearest: Comanche (CO) |
| Built | HB FULLER CO - DATA CENTER - ARDEN HILLS | Large load | — | 6.4 mi away | nearest: Riverside (MN) |
| Filed | Fortress 1 | Solar + storage | 398.9 MW | 6.4 mi away | nearest: Pawnee |
| Under construction | Pawnee Solar & BESS | Solar + storage | 450 MW | 6.5 mi away | nearest: Manchief Electric Generating Station |
| Built | OPTUM TECHNOLOGY | Large load | — | 7.2 mi away | nearest: Riverside (MN) |
| Under construction | Fuller Garden | Solar | 1 MW | 7.5 mi away | nearest: Sherburne County |
| Built | ORACLE AMERICA - BROOMFIELD CAMPUS | Large load | — | 7.9 mi away | nearest: Valmont |
| Built | VISA USA - O.C.C. DATA CENTER CAMPUS | Large load | — | 7.9 mi away | nearest: Arapahoe |
| Postponed | Seven Mile Creek LFG | Biomass | 0.8 MW | 8.0 mi away | nearest: Wheaton |
| Unknown | FLEXENTIAL - DEN03 DATA CENTER | Large load | — | 8.2 mi away | nearest: Arapahoe |
| Under construction | Keenesburg | Solar | 7.2 MW | 8.2 mi away | nearest: Rocky Mountain Energy Center |
Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES